Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12074
Well Classification: GW Status: PR - 4/9/2008
Well Name/No:N. PARACHUTE #WF06C K25A 596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/9/2008
FacilityID:284096LocationID:335649
County:GARFIELD #045Location:NESW 25 5S96W 6
Field:GRAND VALLEY - #31290Elevation:5883 ft.
Basin:PICEANCE BASIN  
Planned Location:2489FSL  1703 FWLLat/Long: 39.585730 / -108.121310Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.585726 / -108.121319Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/9/2008             Measured TD: 9050 ft.    Vertical TD: 8992 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/9/2008
Wellbore PermitDIRECTIONAL
Permit #:20071598 Expiration Date:5/6/2008
Proposed Top PZ Location:Sec: Twp: Footage: 330 FNL  2310 FEL
Bottom Hole Location:Sec:25 Twp: 5S 96W Footage: 2192 FNL  2001 FWL
Proposed Depth/Form:10236 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/18/2007
Spud Date:9/14/2007Spud Date Is:ACTUAL
Measured TD:9050 ft.Measured PB depth:8980 ft.
True Vertical TD:8992 ft.True Vertical PB depth:8912 ft.
Top PZ Location:Sec:25 Twp: 5S 96WFootage: 2160 FNL  2024 FWL
Bottom Hole Location:Sec:25 Twp: 5S 96WFootage: 2160 FNL  2024 FWL
Log Types:FES/RST, CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2565 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 508, Top: 0 ft., Bottom: 2546 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9035 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1325, Top: 2348 ft., Bottom: 9035 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5160 ft.8857 ft.NN
ROLLINS8858 ft.9050 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 4/9/2008                  Interval Top: 5216 ft.    Interval Bottom: 8716 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:4/2/2008Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/17/2008
Treatment Summary:STAGES 1-11 TREATED W/ A TOTAL OF 45900 BBLS SLICKWATER, 721502 LBS 20/40 SAND 212337 LBS 30/50 SAND. NO HCL USED.
Tubing Size:2.375 in.Tubing Setting Depth:2147 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/9/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_GOR 0
CASING_PRESS 1000
MCF_GAS 1572
TUBING_PRESS 650
Perforation Data:
Interval Top:5216 ft.# Of Holes:330
Interval Bottom:8716 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)143
Total Gas Produced (MCF)26785
GOR187307
GOR DeterminationMCFE
Average BOE per Day13.042
Average MCFE per Day75.645

 Federal Financial Assurance  i 

 Tribal Well  i No