Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12053
Well Classification: GW Status: PR - 3/23/2006
Well Name/No:HOAGLUND #PA 312-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 53631
Facility Status:PRStatus Date3/23/2006
FacilityID:283978LocationID:334724
County:GARFIELD #045Location:NWNW 2 7S95W 6
Field:PARACHUTE - #67350Elevation:5208 ft.
Basin:PICEANCE BASIN  
Planned Location:949FNL  420 FWLLat/Long: 39.471052 / -107.973500Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471052 / -107.973509Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/31/2006             Measured TD: 6968 ft.    Vertical TD: 6871 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/31/2006
Wellbore PermitDIRECTIONAL
Permit #:20060471 Expiration Date:3/22/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1663 FNL  867 FWL
Bottom Hole Location:Sec:2 Twp: 7S 95W Footage: 1663 FNL  867 FWL
Proposed Depth/Form:7069 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:11/1/2006
Spud Date:10/20/2006Spud Date Is:ACTUAL
Measured TD:6968 ft.Measured PB depth:6906 ft.
True Vertical TD:6871 ft.True Vertical PB depth:
Top PZ Location:Sec:2 Twp: 7S 95WFootage: 1748 FNL  815 FWL
Bottom Hole Location:Sec:2 Twp: 7S 95WFootage: 1748 FNL  815 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1625 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 428, Top: 0 ft., Bottom: 1625 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6953 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 975, Top: 3860 ft., Bottom: 6953 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1339 ft.NN
FORT UNION1609 ft.NN
MESAVERDE3623 ft.NN
CAMEO6199 ft.NN
ROLLINS6922 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/16/2007                 Interval Top: 4758 ft.    Interval Bottom: 6734 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/26/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/25/2007
Treatment Summary:3,030 GALS 7.5% HCL; 805,800# 30/50 SAND; 18,001 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6217 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/16/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1116
MCF_GAS 998
TUBING_PRESS 995
Perforation Data:
Interval Top:4758 ft.# Of Holes:120
Interval Bottom:6734 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)13157
GOR657850
GOR DeterminationMCFE
Average BOE per Day6.280
Average MCFE per Day36.427

 Federal Financial Assurance  i 

 Tribal Well  i No