Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12050
Well Classification: GW Status: PR - 3/23/2006
Well Name/No:HOAGLUND #PA 511-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 53631
Facility Status:PRStatus Date3/23/2006
FacilityID:283975LocationID:334724
County:GARFIELD #045Location:NWNW 2 7S95W 6
Field:PARACHUTE - #67350Elevation:5208 ft.
Basin:PICEANCE BASIN  
Planned Location:938FNL  393 FWLLat/Long: 39.471085 / -107.973600Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471083 / -107.973605Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/31/2006             Measured TD: 7096 ft.    Vertical TD: 7078 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/31/2006
Wellbore PermitDIRECTIONAL
Permit #:20060474 Expiration Date:3/22/2007
Proposed Top PZ Location:Sec: Twp: Footage: 822 FNL  529 FWL
Bottom Hole Location:Sec:2 Twp: 7S 95W Footage: 822 FNL  529 FWL
Proposed Depth/Form:7018 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:11/28/2006
Spud Date:11/18/2006Spud Date Is:ACTUAL
Measured TD:7096 ft.Measured PB depth:7020 ft.
True Vertical TD:7078 ft.True Vertical PB depth:
Top PZ Location:Sec:2 Twp: 7S 95WFootage: 812 FNL  756 FWL
Bottom Hole Location:Sec:2 Twp: 7S 95WFootage: 812 FNL  756 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1598 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 1598 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7080 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 975, Top: 3080 ft., Bottom: 7080 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1344 ft.NN
FORT UNION1624 ft.NN
MESAVERDE3601 ft.NN
CAMEO6207 ft.NN
ROLLINS6927 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/13/2007                 Interval Top: 4921 ft.    Interval Bottom: 6846 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/26/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/25/2007
Treatment Summary:3,026 GALS 7.5% HCL; 703,400# 30/50 SAND; 16,444 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6146 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/13/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1434
MCF_GAS 1179
TUBING_PRESS 1320
Perforation Data:
Interval Top:4921 ft.# Of Holes:121
Interval Bottom:6846 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)12933
GOR680684
GOR DeterminationMCFE
Average BOE per Day6.169
Average MCFE per Day35.791

 Federal Financial Assurance  i 

 Tribal Well  i No