|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/14/2007 Measured TD: 9210 ft. Vertical TD: 8710 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/14/2007 | Wellbore Permit | DIRECTIONAL | Permit #: | 20060352 | Expiration Date: | 3/14/2007 | Proposed Top PZ Location: | Sec: Twp: | Footage: 1650 FNL 2310 FEL | Bottom Hole Location: | Sec: Twp: | Footage: 1650 FNL 2310 FEL | Proposed Depth/Form: | 10533 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15.510, Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 8/16/2006 | Spud Date: | 5/2/2006 | Spud Date Is: | ACTUAL | Measured TD: | 9210 ft. | Measured PB depth: | 9134 ft. | True Vertical TD: | 8710 ft. | True Vertical PB depth: | | Top PZ Location: | Sec:36 Twp: 5S 96W | Footage: 1550 FNL 2168 FEL | Bottom Hole Location: | Sec:36 Twp: 5S 96W | Footage: 1550 FNL 2168 FEL | Log Types: | CBL; MUDLOG | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2463 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 695, Top: 0 ft., Bottom: 2463 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9180 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1473, Top: 1000 ft., Bottom: 9210 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | WILLIAMS FORK | 5469 ft. | 9012 ft. | N | N | ROLLINS | 9012 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: PR - 1/14/2007 Interval Top: 5542 ft. Interval Bottom: 8918 ft. Completed Information for Formation WILLIAMS FORK | 1st Production Date: | 12/5/2006 | Choke Size: | 0.375 in. | Formation Name: | WILLIAMS FORK | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/20/2006 | Treatment Summary: | STAGES 01-11 TREATED WITH A TOTAL OF: 41,732 BBLS OF SLICKWATER, 1,464,178 LBS 20-40 SAND WITH 35.7 BBLS 15% HCL. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6723 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/14/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1170 | CALC_MCF_GAS | 1325 | CASING_PRESS | 1725 | MCF_GAS | 1325 | TUBING_PRESS | 1150 |
| Perforation Data: | Interval Top: | 5542 ft. | # Of Holes: | 297 | Interval Bottom: | 8918 ft. | Hole Size: | 0.43 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 151 |
Total Gas Produced (MCF) | 26318 |
GOR | 174291 |
GOR Determination | MCFE |
Average BOE per Day | 12.839 |
Average MCFE per Day | 74.468 |
Federal Financial Assurance | i | |
|
|