Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12002
Well Classification: GW Status: PR - 5/3/2007
Well Name/No:N. PARACHUTE #WF06B A36 596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/3/2007
FacilityID:283784LocationID:335848
County:GARFIELD #045Location:NENE 36 5S96W 6
Field:GRAND VALLEY - #31290Elevation:5792 ft.
Planned Location:298FNL  523 FELLat/Long: 39.578089 / -108.110470Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.578084 / -108.110474Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/3/2007             Measured TD: 9690 ft.    Vertical TD: 8670 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/3/2007
Wellbore PermitDIRECTIONAL
Permit #:20060354 Expiration Date:3/14/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1650 FNL  1650 FWL
Bottom Hole Location:Sec:36 Twp: 5S 96W Footage: 1650 FNL  1650 FWL
Proposed Depth/Form:11223 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/26/2006
Spud Date:4/20/2006Spud Date Is:ACTUAL
Measured TD:9690 ft.Measured PB depth:9633 ft.
True Vertical TD:8670 ft.True Vertical PB depth:8613 ft.
Top PZ Location:Sec:36 Twp: 5S 96WFootage: 1547 FNL  1894 FWL
Bottom Hole Location:Sec:36 Twp: 5S 96WFootage: 1547 FNL  1894 FWL
Log Types:CBL & MUD
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2485 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 697, Top: 0 ft., Bottom: 2485 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9678 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1572, Top: 2226 ft., Bottom: 9690 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH3692 ft.5957 ft.NN
WILLIAMS FORK5957 ft.9501 ft.NN
ROLLINS9501 ft.9690 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/3/2007                  Interval Top: 6360 ft.    Interval Bottom: 9413 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:12/11/2006Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/8/2006
Treatment Summary:STAGES 1-9 TREATED WITH A TOTAL OF 39,754 BBLS OF SLICKWATER, 1,531,880 LBS 20-40 SAND, AND 41 BBLS OF 15% HCI
Tubing Size:2.375 in.Tubing Setting Depth:8825 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/3/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 1291
CASING_PRESS 4
MCF_GAS 1291
TUBING_PRESS 715
Perforation Data:
Interval Top:6360 ft.# Of Holes:249
Interval Bottom:9413 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)82
Total Gas Produced (MCF)13499
GOR164621
GOR DeterminationMCFE
Average BOE per Day6.615
Average MCFE per Day38.357

 Federal Financial Assurance  i 

 Tribal Well  i No