Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11997
Well Classification: GW Status: PR - 3/12/2007
Well Name/No:N. PARACHUTE #WF03D A36 596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/12/2007
FacilityID:283796LocationID:335848
County:GARFIELD #045Location:NENE 36 5S96W 6
Field:GRAND VALLEY - #31290Elevation:5792 ft.
Planned Location:268FNL  525 FELLat/Long: 39.578172 / -108.110486Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.578176 / -108.110488Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/12/2007             Measured TD: 9360 ft.    Vertical TD: 8733 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/12/2007
Wellbore PermitDIRECTIONAL
Permit #:20071218 Expiration Date:4/8/2008
Proposed Top PZ Location:Sec: Twp: Footage: 990 FNL  2310 FWL
Bottom Hole Location:Sec:36 Twp: 5S 96W Footage: 990 FNL  2310 FWL
Proposed Depth/Form:10781 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/2/2007
Spud Date:5/18/2007Spud Date Is:ACTUAL
Measured TD:9360 ft.Measured PB depth:9301 ft.
True Vertical TD:8733 ft.True Vertical PB depth:
Top PZ Location:Sec:36 Twp: 5S 96WFootage: 891 FNL  2588 FWL
Bottom Hole Location:Sec:36 Twp: 5S 96WFootage: 891 FNL  2588 FWL
Log Types:MUD,CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 105 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 105 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2523 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 2535 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9346 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1275, Top: 3032 ft., Bottom: 9360 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5500 ft.9106 ft.NN
ROLLINS9106 ft.9360 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 1/2/2008                  Interval Top: 5556 ft.    Interval Bottom: 9032 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/19/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/19/2007
Treatment Summary:STAGES 01-10 TREATED WITH A TOTAL OF: 32758 BBLS SLICKWATER, 824000 LBS 20-40 SAND, 405000 LBS 30-50 SAND AND 36 BBLS 15% HCL.
Tubing Size:2.375 in.Tubing Setting Depth:6718 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/2/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 696
MCF_GAS 466
TUBING_PRESS 472
Perforation Data:
Interval Top:5556 ft.# Of Holes:300
Interval Bottom:9032 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)90
Total Gas Produced (MCF)15519
GOR172433
GOR DeterminationMCFE
Average BOE per Day7.585
Average MCFE per Day43.975

 Federal Financial Assurance  i 

 Tribal Well  i No