Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11995
Well Classification: GW Status: PR - 1/1/2021
Well Name/No:N. PARACHUTE #WF02B A36 596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2021
FacilityID:283800LocationID:335848
County:GARFIELD #045Location:NENE 36 5S96W 6
Field:GRAND VALLEY - #31290Elevation:5793 ft.
Planned Location:238FNL  528 FELLat/Long: 39.578256 / -108.110503Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.578256 / -108.110493Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2021             Measured TD: 9150 ft.    Vertical TD: 8803 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20071220 Expiration Date:4/8/2008
Proposed Top PZ Location:Sec: Twp: Footage: 330 FNL  2310 FEL
Bottom Hole Location:Sec:36 Twp: 5S 96W Footage: 330 FNL  2310 FEL
Proposed Depth/Form:10337 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/16/2007
Spud Date:4/29/2007Spud Date Is:ACTUAL
Measured TD:9150 ft.Measured PB depth:9084 ft.
True Vertical TD:8803 ft.True Vertical PB depth:8737 ft.
Top PZ Location:Sec:36 Twp: 5S 96WFootage: 329 FNL  2279 FEL
Bottom Hole Location:Sec:36 Twp: 5S 96WFootage: 329 FNL  2279 FEL
Log Types:CBL AND MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 105 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 105 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2509 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 2510 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9130 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1270, Top: 2324 ft., Bottom: 9774 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5304 ft.8899 ft.NN
ROLLINS8899 ft.9150 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 1/1/2021                  Interval Top: 5437 ft.    Interval Bottom: 8414 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/19/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/16/2007
Treatment Summary:STAGES 2-11 TREATED W/TOTAL OF: 36,509 BBL SLICKWATER, 989,000 LBS 20-40 SAND, 380,000 LBS 30-50 SAND AND 36 BBL 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:5583 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 1170
CASING_PRESS 612
MCF_GAS 723
TUBING_PRESS 398
Perforation Data:
Interval Top:5437 ft.# Of Holes:300
Interval Bottom:8414 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)122
Total Gas Produced (MCF)21250
GOR174180
GOR DeterminationMCFE
Average BOE per Day10.374
Average MCFE per Day60.150

 Federal Financial Assurance  i 

 Tribal Well  i No