Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11990
Well Classification: GW Status: PR - 3/10/2006
Well Name/No:CHEVRON #GM 543-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/10/2006
FacilityID:283751LocationID:335170
County:GARFIELD #045Location:NESE 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5525 ft.
Basin:PICEANCE BASIN  
Planned Location:1964FSL  949 FELLat/Long: 39.507894 / -108.126682Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.507845 / -108.126369Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/23/2006             Measured TD: 6964 ft.    Vertical TD: 6902 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/23/2006
Wellbore PermitDIRECTIONAL
Permit #:20060314 Expiration Date:3/9/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2241 FSL  272 FEL
Bottom Hole Location:Sec:20 Twp: 6S 96W Footage: 2241 FSL  272 FEL
Proposed Depth/Form:6975 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:7/27/2006
Spud Date:7/15/2006Spud Date Is:ACTUAL
Measured TD:6964 ft.Measured PB depth:6926 ft.
True Vertical TD:6902 ft.True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6S 96WFootage: 2250 FSL  250 FEL
Bottom Hole Location:Sec:20 Twp: 6S 96WFootage: 2250 FSL  250 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1131 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6952 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 818, Top: 3180 ft., Bottom: 6952 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2081 ft.NN
FORT UNION2334 ft.NN
MESAVERDE3785 ft.NN
CAMEO6402 ft.NN
ROLLINS6830 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/5/2006                 Interval Top: 5023 ft.    Interval Bottom: 6775 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/14/2006Choke Size:0.234 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2006
Treatment Summary:3127 GALS 7 1/2% HCL; 740,000# 30/50 SAND; 18281 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6385 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/5/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1047
MCF_GAS 1107
TUBING_PRESS 882
Perforation Data:
Interval Top:5023 ft.# Of Holes:112
Interval Bottom:6775 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)14750
GOR526785
GOR DeterminationMCFE
Average BOE per Day7.047
Average MCFE per Day40.859

 Federal Financial Assurance  i 

 Tribal Well  i No