Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11989
Well Classification: GW Status: PR - 3/10/2006
Well Name/No:CHEVRON #GM 533-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/10/2006
FacilityID:283750LocationID:335170
County:GARFIELD #045Location:NESE 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5525 ft.
Basin:PICEANCE BASIN  
Planned Location:1991FSL  968 FELLat/Long: 39.507968 / -108.126751Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.507912 / -108.126429Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/23/2006             Measured TD: 6965 ft.    Vertical TD: 6842 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/23/2006
Wellbore PermitDIRECTIONAL
Permit #:20060313 Expiration Date:3/9/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1870 FSL  2000 FEL
Bottom Hole Location:Sec:20 Twp: 6S 96W Footage: 1870 FSL  2000 FEL
Proposed Depth/Form:6969 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:6/30/2006
Spud Date:6/15/2006Spud Date Is:ACTUAL
Measured TD:6965 ft.Measured PB depth:6918 ft.
True Vertical TD:6842 ft.True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6S 96WFootage: 1874 FSL  1992 FEL
Bottom Hole Location:Sec:20 Twp: 6S 96WFootage: 1874 FSL  1992 FEL
Log Types:CBL; HIGH RES.INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1136 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1136 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6945 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 821, Top: 1990 ft., Bottom: 6945 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2064 ft.NN
FORT UNION2365 ft.NN
MESAVERDE3803 ft.NN
CAMEO6349 ft.NN
ROLLINS6814 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/29/2006                 Interval Top: 5135 ft.    Interval Bottom: 6756 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/14/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2006
Treatment Summary:3523 GALS 7 1/2% HCL; 987100# 30/50 SAND; 23411 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6406 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/29/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1469
MCF_GAS 1304
TUBING_PRESS 1336
Perforation Data:
Interval Top:5135 ft.# Of Holes:129
Interval Bottom:6756 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)11505
GOR547857
GOR DeterminationMCFE
Average BOE per Day5.493
Average MCFE per Day31.862

 Federal Financial Assurance  i 

 Tribal Well  i No