Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11988
Well Classification: GW Status: PR - 3/10/2006
Well Name/No:CHEVRON #GM 432-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/10/2006
FacilityID:283749LocationID:335457
County:GARFIELD #045Location:SWNE 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5553 ft.
Basin:PICEANCE BASIN  
Planned Location:2243FNL  2420 FELLat/Long: 39.510842 / -108.131931Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.510948 / -108.131560Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/23/2006             Measured TD: 6970 ft.    Vertical TD: 6927 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/23/2006
Wellbore PermitDIRECTIONAL
Permit #:20060309 Expiration Date:3/9/2007
Proposed Top PZ Location:Sec:20 Twp: 6S 96W Footage: 1869   1796 
Bottom Hole Location:Sec:20 Twp: 6S 96W Footage: 1869   1796 
Proposed Depth/Form:6965 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:6/3/2006
Spud Date:5/26/2006Spud Date Is:ACTUAL
Measured TD:6970 ft.Measured PB depth:6937 ft.
True Vertical TD:6927 ft.True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6S 96WFootage: 1869 FNL  1796 FEL
Bottom Hole Location:Sec:20 Twp: 6S 96WFootage: 1869 FNL  1796 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1135 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1135 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6961 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 825, Top: 2300 ft., Bottom: 6961 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2030 ft.NN
FORT UNION2323 ft.NN
MESAVERDE3760 ft.NN
CAMEO6333 ft.NN
ROLLINS6805 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/12/2006                 Interval Top: 5116 ft.    Interval Bottom: 6754 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/7/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/6/2006
Treatment Summary:2510 GALS 7 1/2% HCL; 634800# 30/50 SAND; 17423 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6329 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/12/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1299
MCF_GAS 836
TUBING_PRESS 1122
Perforation Data:
Interval Top:5116 ft.# Of Holes:105
Interval Bottom:6754 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9150
GOR762500
GOR DeterminationMCFE
Average BOE per Day4.354
Average MCFE per Day25.267

 Federal Financial Assurance  i 

 Tribal Well  i No