Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11968
Well Classification: GW Status: PA - 3/5/2015
Well Name/No:WILLIAMS #PA 13-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/5/2015
FacilityID:283567LocationID:334760
County:GARFIELD #045Location:NESE 1 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5231 ft.
Basin:PICEANCE BASIN  
Planned Location:1558FSL  352 FELLat/Long: 39.464029 / -108.050540Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.464044 / -108.050536Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/5/2015             Measured TD: 6800 ft.    Vertical TD: 6500 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/5/2015
Wellbore PermitDIRECTIONAL
Permit #:20060777 Expiration Date:3/1/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1757 FSL  1049 FWL
Bottom Hole Location:Sec:6 Twp: 7S 95W Footage: 1757 FSL  1049 FWL
Proposed Depth/Form:6852 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-12 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:4/12/2006
Spud Date:3/29/2006Spud Date Is:ACTUAL
Measured TD:6800 ft.Measured PB depth:6748 ft.
True Vertical TD:6500 ft.True Vertical PB depth:6348 ft.
Top PZ Location:Sec:6 Twp: 7s 95wFootage: 1780 FSL  1059 FWL
Bottom Hole Location:Sec:6 Twp: 7s 95wFootage: 1779 FSL  1053 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Log Types:SP/GR/HDIL/ZDL/CN and CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1134 ft., Weight: 32.3# , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1134 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6780 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 3270 ft., Bottom: 6780 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2475 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 430 ft., Bottom: 2475 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 5007 ft., Depth: 5023 ft., Bottom: 5023 ft., Sacks: 100, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 2460 ft., Depth: 2369 ft., Bottom: 2475 ft., Sacks: 550, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WASATCH G1456 ft.
FORT UNION1993 ft.
MESAVERDE3730 ft.
CAMEO6228 ft.
ROLLINS6781 ft.

Formation WFCM                     Formation Classification:  SI                     Status:  AB - 3/5/2015                  Interval Top: 5007 ft.    Interval Bottom: 6661 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/11/2006
Treatment Summary:Casing leak found to be between 2460’ & 2475’ using plug and packer to isolate. POOH w/ plug and packer. RIH w/ RBP and set @ 2671’ and pkr @ 2660’, pressure test good. Pull pkr up hole to set @ 2398’ and broke circulating through leak to surface through bradenhead. POOH w/ pkr and wait on cement crew. RIH to set cmt retainer @ 2368’ and pump injection test. Mix and pump 550 sks of 15.8# Class G cement and tail in with 50 sks of 17# Class G cement. Displaced cement with 10.75 BBL of water and squeeze cement to 891 psi. Sting out of cmt retainer and reverse out with remaining ¼ BBL of cement. Shut down rig crew and allowed cement to set up for 42 hrs. RIH w/ 3 7/8” rock bit and drilled cmt retainer out from 2368’ to 2370’. Drilled cement from 2370’ to 2479’ and fell through. Pressure tested squeeze to 1500 psi for 15 min, test good. POOH w/ bit and RIH w/ retrieving head to release RBP @ 2671’. POOH w/ retrieving head and RBP. RU wireline crew to run CBL from 4350’ to surface showing new cement top @ 430’ and excellent bond to 792’. RIH w/ 2 3/8” tbg and set @ 6150’, RDMO. (SEE DOC # 400291240 FOR CBL.) dhs
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_MCF_GAS 1318
CASING_PRESS 1574
MCF_GAS 1318
TUBING_PRESS 1451
Perforation Data:
Interval Top:5007 ft.# Of Holes:118
Interval Bottom:6661 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/05/2015
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No