Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11959
Well Classification: GW Status: PR - 12/13/2007
Well Name/No:FEDERAL #GM 334-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 24603
Facility Status:PRStatus Date12/13/2007
FacilityID:283580LocationID:334718
County:GARFIELD #045Location:NESE 4 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6065 ft.
Basin:PICEANCE BASIN  
Planned Location:1738FSL  771 FELLat/Long: 39.463475 / -108.107830Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.463476 / -108.107840Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/13/2007             Measured TD: 6886 ft.    Vertical TD: 6782 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/13/2007
Wellbore Permit
Permit #:20060239 Expiration Date:3/1/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1236 FSL  1502 FEL
Bottom Hole Location:Sec:4 Twp: 7S 96W Footage: 1236 FSL  1502 FEL
Proposed Depth/Form:6866 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:11/26/2006
Spud Date:11/15/2006Spud Date Is:ACTUAL
Measured TD:6886 ft.Measured PB depth:6718 ft.
True Vertical TD:6782 ft.True Vertical PB depth:
Top PZ Location:Sec:4 Twp: 7S 96WFootage: 1246 FSL  1544 FEL
Bottom Hole Location:Sec:4 Twp: 7S 96WFootage: 1246 FSL  1544 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1127 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1118 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6867 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 796, Top: 2650 ft., Bottom: 6687 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2186 ft.NN
FORT UNION2488 ft.NN
MESAVERDE3785 ft.NN
CAMEO6266 ft.NN
ROLLINS6739 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/13/2007                Interval Top: 5026 ft.    Interval Bottom: 6568 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/23/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/8/2006
Treatment Summary:3371 GALS 7 1/2% HCL; 874,900# 30/50 SAND; 15974 BBLS SLICKWATER; 644 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:6085 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/4/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1382
MCF_GAS 1112
TUBING_PRESS 1292
Perforation Data:
Interval Top:5026 ft.# Of Holes:108
Interval Bottom:6568 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)17569
GOR532393
GOR DeterminationMCFE
Average BOE per Day8.401
Average MCFE per Day48.713

 Federal Financial Assurance  i Y

 Tribal Well  i No