Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11880
Well Classification: GW Status: PR - 1/31/2006
Well Name/No:KNIGHT #PA 312-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/31/2006
FacilityID:282951LocationID:334598
County:GARFIELD #045Location:NWNW 3 7S95W 6
Field:PARACHUTE - #67350Elevation:5153 ft.
Basin:PICEANCE BASIN  
Planned Location:875FNL  311 FWLLat/Long: 39.471044 / -107.992520Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471044 / -107.992522Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/16/2005             Measured TD: 6810 ft.    Vertical TD: 6696 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/16/2005
Wellbore PermitDIRECTIONAL
Permit #:20055054 Expiration Date:1/30/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1768 FNL  595 FWL
Bottom Hole Location:Sec:3 Twp: 7S 95W Footage: 1768 FNL  595 FWL
Proposed Depth/Form:6823 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 640, Drill Unit: SEC.

Wellbore Completed
Completion Date:4/1/2006
Spud Date:3/24/2006Spud Date Is:ACTUAL
Measured TD:6810 ft.Measured PB depth:6800 ft.
True Vertical TD:6696 ft.True Vertical PB depth:
Top PZ Location:Sec:3 Twp: 7S 95WFootage: 1777 FNL  618 FWL
Bottom Hole Location:Sec:3 Twp: 7S 95WFootage: 1777 FNL  618 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1434 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 0 ft., Bottom: 1434 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6795 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 1854 ft., Bottom: 6795 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1212 ft.NN
FORT UNION1478 ft.NN
MESAVERDE3373 ft.NN
CAMEO6006 ft.NN
ROLLINS6685 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/3/2006                  Interval Top: 4758 ft.    Interval Bottom: 6619 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/19/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/15/2006
Treatment Summary:4130 GALS 7 1/2% HCL; 824,300# 30/50 SAND; 19,407 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6242 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/3/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1800
MCF_GAS 1589
TUBING_PRESS 1730
Perforation Data:
Interval Top:4758 ft.# Of Holes:140
Interval Bottom:6619 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)22232
GOR823407
GOR DeterminationMCFE
Average BOE per Day10.582
Average MCFE per Day61.366

 Federal Financial Assurance  i 

 Tribal Well  i No