Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11879
Well Classification: GW Status: PR - 1/31/2006
Well Name/No:KNIGHT #PA 412-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/31/2006
FacilityID:282952LocationID:334598
County:GARFIELD #045Location:NWNW 3 7S95W 6
Field:PARACHUTE - #67350Elevation:5153 ft.
Basin:PICEANCE BASIN  
Planned Location:878FNL  296 FWLLat/Long: 39.471046 / -107.992570Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471045 / -107.992576Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/16/2005             Measured TD: 6847 ft.    Vertical TD: 6654 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/16/2005
Wellbore PermitDIRECTIONAL
Permit #:20055055 Expiration Date:1/30/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2051 FNL  549 FWL
Bottom Hole Location:Sec:3 Twp: 7S 95W Footage: 2051 FNL  549 FWL
Proposed Depth/Form:6876 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 640, Drill Unit: SEC.

Wellbore Completed
Completion Date:4/14/2006
Spud Date:4/5/2006Spud Date Is:ACTUAL
Measured TD:6847 ft.Measured PB depth:6795 ft.
True Vertical TD:6654 ft.True Vertical PB depth:
Top PZ Location:Sec:3 Twp: 7S 95WFootage: 2068 FNL  573 FWL
Bottom Hole Location:Sec:3 Twp: 7S 95WFootage: 2068 FNL  573 FWL
Log Types:CBL,PLATFORM EXPRESS,GAMMA RAY,ARRAY INDUCTION/SP
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1462 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1461 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6839 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 2800 ft., Bottom: 6838 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1230 ft.NN
FORT UNION1497 ft.NN
MESAVERDE3432 ft.NN
CAMEO COAL6067 ft.NN
ROLLINS6752 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/16/2006                 Interval Top: 4816 ft.    Interval Bottom: 6681 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/19/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/15/2006
Treatment Summary:3502 GALS 7 1/2% HCL; 885,200# 30/50 SAND; 20,511 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6306 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/16/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1824
MCF_GAS 1512
TUBING_PRESS 11759
Perforation Data:
Interval Top:4816 ft.# Of Holes:138
Interval Bottom:6681 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)21027
GOR750964
GOR DeterminationMCFE
Average BOE per Day10.022
Average MCFE per Day58.134

 Federal Financial Assurance  i 

 Tribal Well  i No