Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11876
Well Classification: GW Status: PR - 1/31/2006
Well Name/No:KNIGHT #PA 12-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/31/2006
FacilityID:282955LocationID:334598
County:GARFIELD #045Location:NWNW 3 7S95W 6
Field:PARACHUTE - #67350Elevation:5153 ft.
Basin:PICEANCE BASIN  
Planned Location:879FNL  326 FWLLat/Long: 39.471043 / -107.992460Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471042 / -107.992470Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/16/2005             Measured TD: 6765 ft.    Vertical TD: 6705 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/16/2005
Wellbore PermitDIRECTIONAL
Permit #:20055053 Expiration Date:1/30/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1496 FNL  611 FWL
Bottom Hole Location:Sec:3 Twp: 7S 96W Footage: 1496 FNL  611 FWL
Proposed Depth/Form:6786 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 640, Drill Unit: SEC.

Wellbore Completed
Completion Date:3/22/2006
Spud Date:3/14/2006Spud Date Is:ACTUAL
Measured TD:6765 ft.Measured PB depth:6700 ft.
True Vertical TD:6705 ft.True Vertical PB depth:
Top PZ Location:Sec:3 Twp: 7S 95WFootage: 1504 FNL  636 FWL
Bottom Hole Location:Sec:3 Twp: 7S 95WFootage: 1504 FNL  636 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1420 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1420 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6750 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 2360 ft., Bottom: 6749 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1201 ft.NN
FORT UNION1463 ft.NN
MESAVERDE3332 ft.NN
CAMEO5961 ft.NN
ROLLINS6639 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/9/2006                  Interval Top: 4717 ft.    Interval Bottom: 6571 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/19/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/15/2006
Treatment Summary:3460 GALS 7 1/2% HCL; 841,600# 30/50 SAND; 20,006 BBLS SLICKWATR (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6264 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/9/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1985
MCF_GAS 1753
TUBING_PRESS 1902
Perforation Data:
Interval Top:4717 ft.# Of Holes:141
Interval Bottom:6571 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)15606
GOR780300
GOR DeterminationMCFE
Average BOE per Day7.437
Average MCFE per Day43.150

 Federal Financial Assurance  i 

 Tribal Well  i No