Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11871
Well Classification: GW Status: PR - 2/13/2007
Well Name/No:N. PARACHUTE #EF 13B C28 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/13/2007
FacilityID:282917LocationID:335657
County:GARFIELD #045Location:NENW 28 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6168 ft.
Basin:PICEANCE BASIN  
Planned Location:1246FNL  2116 FWLLat/Long: 39.588620 / -108.061140Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.588637 / -108.061161Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/13/2007             Measured TD: 10266 ft.    Vertical TD: 9778 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/13/2007
Wellbore PermitDIRECTIONAL
Permit #:20070928 Expiration Date:3/27/2008
Proposed Top PZ Location:Sec: Twp: Footage: 990 FSL  330 FWL
Bottom Hole Location:Sec:21 Twp: 5S 95W Footage: 990 FSL  330 FWL
Proposed Depth/Form:11122 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/24/2007
Spud Date:8/5/2007Spud Date Is:ACTUAL
Measured TD:10266 ft.Measured PB depth:10180 ft.
True Vertical TD:9778 ft.True Vertical PB depth:9692 ft.
Top PZ Location:Sec:21 Twp: 5S 95WFootage: 595 FSL  760 FWL
Bottom Hole Location:Sec:21 Twp: 5S 95WFootage: 595 FSL  760 FWL
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2468 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 0 ft., Bottom: 2468 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10226 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1515, Top: 2800 ft., Bottom: 10266 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6356 ft.10107 ft.NN
ROLLINS10107 ft.10266 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 4/1/2008                  Interval Top: 6394 ft.    Interval Bottom: 9975 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/22/2008Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/4/2007
Treatment Summary:STAGES 01-13 TREATED W/TOTAL 29755 BBLS SLICKWATER, 766232 LBS 20-40 SAND, 318383 LBS 30-50 SAND. AND 36 BBLS 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:7213 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 603
MCF_GAS 735
TUBING_PRESS 242
Perforation Data:
Interval Top:6394 ft.# Of Holes:390
Interval Bottom:9975 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)49
Total Gas Produced (MCF)9551
GOR194918
GOR DeterminationMCFE
Average BOE per Day4.645
Average MCFE per Day26.928

 Federal Financial Assurance  i 

 Tribal Well  i No