Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11833
Well Classification: GW Status: PR - 1/23/2006
Well Name/No:N.PARACHUTE #MF08C C04 696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/23/2006
FacilityID:282779LocationID:311638
County:GARFIELD #045Location:NENW 4 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5818 ft.
Planned Location:1048FNL  2483 FWLLat/Long: 39.561542 / -108.111694Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.561538 / -108.111664Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/5/2005             Measured TD: 9149 ft.    Vertical TD: 8530 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/5/2005
Wellbore PermitDIRECTIONAL
Permit #:20054848 Expiration Date:1/22/2007
Proposed Top PZ Location:Sec: Twp: Footage: 485 FNL  330 FEL
Bottom Hole Location:Sec:4 Twp: 6S 96W Footage: 1815 FNL  990 FEL
Proposed Depth/Form:10107 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15,510, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/15/2006
Spud Date:6/12/2006Spud Date Is:ACTUAL
Measured TD:9149 ft.Measured PB depth:9103 ft.
True Vertical TD:8530 ft.True Vertical PB depth:8484 ft.
Top PZ Location:Sec:4 Twp: 6S 96WFootage: 1717 FNL  788 FEL
Bottom Hole Location:Sec:4 Twp: 6S 96WFootage: 1717 FNL  788 FEL
Log Types:MUD & CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2495 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 2495 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9127 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1223, Top: 2300 ft., Bottom: 9106 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5400 ft.8927 ft.NN
ROLLINS8927 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 12/13/2007                Interval Top: 5622 ft.    Interval Bottom: 8711 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/12/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/13/2007
Treatment Summary:STAGES 1-8 TREATED W/A TOTAL OF: 28,751 BBLS OF SLICKWATER; 1,055,000# 20/40 SAND & 48 BBLS OF 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:6372 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/13/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 1170
CASING_PRESS 673
MCF_GAS 1591
TUBING_PRESS 1172
Perforation Data:
Interval Top:5622 ft.# Of Holes:213
Interval Bottom:8711 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)108
Total Gas Produced (MCF)18741
GOR173527
GOR DeterminationMCFE
Average BOE per Day9.191
Average MCFE per Day53.294

 Federal Financial Assurance  i 

 Tribal Well  i No