Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11829
Well Classification: GW Status: PR - 1/23/2006
Well Name/No:N.PARACHUTE #MF08A CO4 696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/23/2006
FacilityID:282784LocationID:311638
County:GARFIELD #045Location:NENW 4 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5821 ft.
Basin:PICEANCE BASIN  
Planned Location:1049FNL  2491 FWLLat/Long: 39.560798 / -108.111807Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.561536 / -108.111667Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/5/2005             Measured TD: 9200 ft.    Vertical TD: 8543 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/5/2005
Wellbore PermitDIRECTIONAL
Permit #:20054857 Expiration Date:1/22/2007
Proposed Top PZ Location:Sec: Twp: Footage: 990 FNL  317 FWL
Bottom Hole Location:Sec:4 Twp: 6S 96W Footage: 1170 FNL  330 FEL
Proposed Depth/Form:10488 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15,510, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/15/2006
Spud Date:5/20/2006Spud Date Is:ACTUAL
Measured TD:9200 ft.Measured PB depth:9105 ft.
True Vertical TD:8543 ft.True Vertical PB depth:8448 ft.
Top PZ Location:Sec:4 Twp: 6S 96WFootage: 1077 FNL  431 FEL
Bottom Hole Location:Sec:4 Twp: 6S 96WFootage: 1077 FNL  431 FEL
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2494 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 2495 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9151 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1504, Top: 2468 ft., Bottom: 9151 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5522 ft.9037 ft.NN
ROLLINS9037 ft.9200 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/30/2007                Interval Top: 5746 ft.    Interval Bottom: 8895 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/12/2007Choke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/15/2006
Treatment Summary:STAGES 1-9 TREATED WITH A TOTAL OF; 36,417 BBLS OF SLICKWATER, 1,297,000 LBS 20-40 SAND, AND 24 BBLS 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:1961 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 1050
MCF_GAS 1042
TUBING_PRESS 790
Perforation Data:
Interval Top:5746 ft.# Of Holes:237
Interval Bottom:8895 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)11667
GOR191262
GOR DeterminationMCFE
Average BOE per Day5.676
Average MCFE per Day32.911

 Federal Financial Assurance  i 

 Tribal Well  i No