Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11822
Well Classification: GW Status: PR - 7/23/2006
Well Name/No:CHEVRON #GM 442-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/23/2006
FacilityID:282747LocationID:324184
County:GARFIELD #045Location:SENE 17 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5590 ft.
Basin:PICEANCE BASIN  
Planned Location:2219FNL  845 FELLat/Long: 39.525617 / -108.125080Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.525590 / -108.126145Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/23/2006             Measured TD: 7222 ft.    Vertical TD: 7124 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/23/2006
Wellbore PermitDIRECTIONAL
Permit #:20054879 Expiration Date:1/19/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2061 FNL  648 FEL
Bottom Hole Location:Sec: Twp: Footage: 2061 FNL  648 FEL
Proposed Depth/Form:7186 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:4/19/2006
Spud Date:4/7/2006Spud Date Is:ACTUAL
Measured TD:7222 ft.Measured PB depth:7150 ft.
True Vertical TD:7124 ft.True Vertical PB depth:
Top PZ Location:Sec:17 Twp: 6S 96WFootage: 1884 FNL  282 FEL
Bottom Hole Location:Sec:17 Twp: 6S 96WFootage: 1884 FNL  282 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1130 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1130 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7210 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 794, Top: 2000 ft., Bottom: 7210 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2141 ft.NN
FORT UNION2427 ft.NN
MESAVERDE3875 ft.NN
ROLLINS6531 ft.NN
CAMEO6531 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/23/2006                 Interval Top: 5390 ft.    Interval Bottom: 6991 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/6/2006Choke Size:0.218 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/19/2006
Treatment Summary:2993 GALS 7 1/2% HCL; 824600# 30/50 SAND; 19381 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6438 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/23/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1290
CASING_PRESS 1406
MCF_GAS 1290
TUBING_PRESS 1291
Perforation Data:
Interval Top:5390 ft.# Of Holes:115
Interval Bottom:6991 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)18
Total Gas Produced (MCF)10605
GOR589166
GOR DeterminationMCFE
Average BOE per Day5.028
Average MCFE per Day29.156

 Federal Financial Assurance  i 

 Tribal Well  i No