Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11820
Well Classification: GW Status: PR - 1/20/2006
Well Name/No:CHEVRON #GM 443-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/20/2006
FacilityID:282745LocationID:324184
County:GARFIELD #045Location:SENE 17 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5590 ft.
Basin:PICEANCE BASIN  
Planned Location:2249FNL  842 FELLat/Long: 39.525535 / -108.125082Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.525507 / -108.126162Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/6/2005             Measured TD: 7219 ft.    Vertical TD: 7188 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/6/2005
Wellbore PermitDIRECTIONAL
Permit #:20054877 Expiration Date:1/19/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2646 FSL  435 FEL
Bottom Hole Location:Sec: Twp: Footage: 2646 FSL  435 FEL
Proposed Depth/Form:7184 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:5/15/2006
Spud Date:5/5/2006Spud Date Is:ACTUAL
Measured TD:7219 ft.Measured PB depth:7182 ft.
True Vertical TD:7188 ft.True Vertical PB depth:
Top PZ Location:Sec:17 Twp: 6S 96WFootage: 2672 FSL  813 FEL
Bottom Hole Location:Sec:17 Twp: 6S 96WFootage: 2672 FSL  813 FEL
Log Types:CBL/ RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1136 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1135 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7208 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 2570 ft., Bottom: 7207 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2138 ft.NN
FORT UNION2418 ft.NN
MESAVERDE3833 ft.NN
CAMEO6499 ft.NN
ROLLINS7017 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/26/2006                 Interval Top: 5308 ft.    Interval Bottom: 6929 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/6/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/5/2006
Treatment Summary:3091 GALS 7 1/2% HCL, 880000# 30/50 SAND; 20143 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6312 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/26/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1556
MCF_GAS 1370
TUBING_PRESS 1483
Perforation Data:
Interval Top:5308 ft.# Of Holes:114
Interval Bottom:6929 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)11964
GOR598200
GOR DeterminationMCFE
Average BOE per Day5.701
Average MCFE per Day33.082

 Federal Financial Assurance  i 

 Tribal Well  i No