Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11803
Well Classification: GW Status: PR - 3/18/2006
Well Name/No:CHEVRON #GM 421-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC56547
Facility Status:PRStatus Date3/18/2006
FacilityID:282720LocationID:335088
County:GARFIELD #045Location:NENW 29 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5707 ft.
Basin:PICEANCE BASIN  
Planned Location:984FNL  1993 FWLLat/Long: 39.499718 / -108.134763Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.499711 / -108.134770Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/18/2006             Measured TD: 6898 ft.    Vertical TD: 6885 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/18/2006
Wellbore PermitDIRECTIONAL
Permit #:20054933 Expiration Date:1/18/2007
Proposed Top PZ Location:Sec: Twp: Footage: 454 FNL  2011 FWL
Bottom Hole Location:Sec: Twp: Footage: 454 FNL  2011 FWL
Proposed Depth/Form:6968 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: NW/4

Wellbore Completed
Completion Date:2/18/2006
Spud Date:2/9/2006Spud Date Is:ACTUAL
Measured TD:6898 ft.Measured PB depth:6807 ft.
True Vertical TD:6885 ft.True Vertical PB depth:
Top PZ Location:Sec:29 Twp: 6S 96WFootage: 448 FNL  2005 FWL
Bottom Hole Location:Sec:29 Twp: 6S 96WFootage: 448 FNL  2005 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1131 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6873 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 823, Top: 2920 ft., Bottom: 6873 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2095 ft.NN
FORT UNION2405 ft.NN
MESAVERDE3798 ft.NN
CAMEO6329 ft.NN
ROLLINS6825 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/18/2006                 Interval Top: 5087 ft.    Interval Bottom: 6707 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/6/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/18/2006
Treatment Summary:2384 GALS 7 1/2% HCL; 874700# 30/50 SAND; 20069 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6125 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/16/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_GOR 155500
CALC_MCF_GAS 1555
CASING_PRESS 1856
MCF_GAS 1555
TUBING_PRESS 1688
Perforation Data:
Interval Top:5087 ft.# Of Holes:110
Interval Bottom:6707 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)19585
GOR725370
GOR DeterminationMCFE
Average BOE per Day9.324
Average MCFE per Day54.094

 Federal Financial Assurance  i 

 Tribal Well  i No