|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 6500 ft. Vertical TD: 6461 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20054595 | Expiration Date: | 1/18/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 330 FNL 1650 FWL | | Bottom Hole Location: | Sec:1 Twp: 8S 96W | Footage: 560 FNL 660 FWL | | Proposed Depth/Form: | 6700 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 139-51 , Unit Acreage: 40, Drill Unit: NENW | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-45 , Unit Acreage: 40, Drill Unit: NENW |
| | |
| Wellbore Completed | | Completion Date: | 4/5/2006 | | Spud Date: | 3/29/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 6500 ft. | Measured PB depth: | 6130 ft. | | True Vertical TD: | 6461 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:1 Twp: 8S 96W | Footage: 530 FNL 670 FWL | | Bottom Hole Location: | Sec:1 Twp: 8S 96W | Footage: 530 FNL 670 FWL | | Log Types: | CBL; RMT | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1521 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1525 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6485 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 3470 ft., Bottom: 6500 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 2843 ft. | | N | N | | CAMEO | 5296 ft. | | N | N | | CORCORAN | 6211 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 5274 ft. Interval Bottom: 5475 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/1/2006 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/1/2006 | | Treatment Summary: | FRAC: 92,780 GAL 7.5% HCL ACID, AND 1,199 SX 30/50 SAND, 108 TONS CO2 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 5274 ft. | # Of Holes: | 24 | | Interval Bottom: | 5475 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 12/31/2006 Interval Top: 4176 ft. Interval Bottom: 5143 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 8/1/2006 | Choke Size: | 0.281 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/1/2006 | | Treatment Summary: | FRAC: 393,980 GAL 7.5% HCL ACID & 4,685 SX 30/50 SAND, 0 TONS CO2 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5254 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/9/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 705 | | CASING_PRESS | 479 | | MCF_GAS | 705 | | TUBING_PRESS | 449 |
| | Perforation Data: | | Interval Top: | 4176 ft. | # Of Holes: | 90 | | Interval Bottom: | 5143 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 6 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.003 |
| Average MCFE per Day | 0.017 |
| Federal Financial Assurance | i | |
|
|