Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11729
Well Classification: GW Status: PR - 3/28/2007
Well Name/No:N.PARACHUTE #EF09B-22 D27 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/28/2007
FacilityID:282315LocationID:335574
County:GARFIELD #045Location:NWNW 27 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6356 ft.
Planned Location:656FNL  926 FWLLat/Long: 39.590210 / -108.046660Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.590218 / -108.046665Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/28/2007             Measured TD: 10953 ft.    Vertical TD: 9276 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/28/2007
Wellbore PermitDIRECTIONAL
Permit #:20071608 Expiration Date:4/22/2008
Proposed Top PZ Location:Sec: Twp: Footage: 330 FNL  1650 FWL
Bottom Hole Location:Sec:22 Twp: 5S 95W Footage: 2306 FSL  987 FEL
Proposed Depth/Form:10691 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/17/2007
Spud Date:6/18/2007Spud Date Is:ACTUAL
Measured TD:10953 ft.Measured PB depth:10922 ft.
True Vertical TD:9276 ft.True Vertical PB depth:9245 ft.
Top PZ Location:Sec:22 Twp: 5S 95WFootage: 2217 FSL  761 FEL
Bottom Hole Location:Sec:22 Twp: 5S 95WFootage: 2217 FSL  761 FEL
Log Types:CBL & MUD.
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2509 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 2509 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10945 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1565, Top: 3350 ft., Bottom: 10945 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK7922 ft.10953 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 2/1/2011                  Interval Top: 8018 ft.    Interval Bottom: 10931 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/4/2008Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/17/2007
Treatment Summary:STAGES 1-10 TREATED WITH A TOTAL OF: 25,216 BBLS SLICKWATER, 623,000 LBS 20-40 SAND, 234,000 LBS 30-50 SAND, AND 36 BBLS OF 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:9092 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/17/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1170
CASING_PRESS 650
MCF_GAS 1348
TUBING_PRESS 200
Perforation Data:
Interval Top:8018 ft.# Of Holes:300
Interval Bottom:10931 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)83
Total Gas Produced (MCF)14534
GOR175108
GOR DeterminationMCFE
Average BOE per Day7.025
Average MCFE per Day40.739

 Federal Financial Assurance  i 

 Tribal Well  i No