Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11723
Well Classification: GW Status: PR - 5/11/2008
Well Name/No:N. PARACHUTE #EF05B-22D27595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/11/2008
FacilityID:282312LocationID:335574
County:GARFIELD #045Location:NWNW 27 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6358 ft.
Planned Location:650FNL  869 FWLLat/Long: 39.590233 / -108.046869Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.590233 / -108.046869Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/11/2008             Measured TD: 11552 ft.    Vertical TD: 10196 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/11/2008
Wellbore PermitDIRECTIONAL
Permit #:20071615 Expiration Date:4/22/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2310 FSL  1650 FWL
Bottom Hole Location:Sec:22 Twp: 5S 95W Footage: 2310 FSL  1650 FWL
Proposed Depth/Form:11394 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/1/2008
Spud Date:11/14/2007Spud Date Is:ACTUAL
Measured TD:11552 ft.Measured PB depth:11435 ft.
True Vertical TD:10196 ft.True Vertical PB depth:10079 ft.
Top PZ Location:Sec:22 Twp: 5S 95WFootage: 1696 FNL  361 FWL
Bottom Hole Location:Sec:22 Twp: 5S 95WFootage: 1696 FNL  361 FWL
Log Types:MUD, CBL, RESERVIOR SATURATION
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 5435 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1850, Top: 0 ft., Bottom: 5435 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11495 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1186, Top: 4898 ft., Bottom: 11499 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK7517 ft.11552 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/11/2008                 Interval Top: 7673 ft.    Interval Bottom: 11161 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:5/2/2008Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/4/2008
Treatment Summary:STAGES 01-11 TREATED WITH A TOTAL OF: 69890 BBLS OF SLICKWATER, 386714 LBS 20-40 SAND, 108843 LBS 30-50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:9472 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/11/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 932
CASING_PRESS 1150
MCF_GAS 932
TUBING_PRESS 550
Perforation Data:
Interval Top:7673 ft.# Of Holes:330
Interval Bottom:11161 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)123
Total Gas Produced (MCF)21109
GOR171617
GOR DeterminationMCFE
Average BOE per Day10.478
Average MCFE per Day60.757

 Federal Financial Assurance  i 

 Tribal Well  i No