Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11721
Well Classification: GW Status: PR - 3/28/2007
Well Name/No:N. PARACHUTE #EF09B-21D27 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/28/2007
FacilityID:282310LocationID:335574
County:GARFIELD #045Location:NWNW 27 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6357 ft.
Planned Location:648FNL  862 FWLLat/Long: 39.590239 / -108.046894Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.590239 / -108.046894Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/28/2007             Measured TD: 10756 ft.    Vertical TD: 10070 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/28/2007
Wellbore PermitDIRECTIONAL
Permit #:20071612 Expiration Date:4/22/2008
Proposed Top PZ Location:Sec:21 Twp: 5S 95W Footage: 2031 FSL  87 FEL
Bottom Hole Location:Sec:21 Twp: 5S 95W Footage: 2031 FSL  87 FEL
Proposed Depth/Form:11630 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/19/2008
Spud Date:1/26/2008Spud Date Is:ACTUAL
Measured TD:10756 ft.Measured PB depth:10614 ft.
True Vertical TD:10070 ft.True Vertical PB depth:9928 ft.
Top PZ Location:Sec:21 Twp: 5S 95WFootage: 2031 FSL  87 FEL
Bottom Hole Location:Sec:21 Twp: 5S 95WFootage: 2031 FSL  87 FEL
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2035 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 0 ft., Bottom: 2035 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10744 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1598, Top: 1770 ft., Bottom: 10756 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6787 ft.10574 ft.NN
ROLLINS10575 ft.10756 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/9/2008                  Interval Top: 6936 ft.    Interval Bottom: 10483 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:5/2/2008Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/2008
Treatment Summary:STAGES 01-11 TREATED W/A TOTAL OF: 64,566 BBLS SLICKWATER; 380625# 20/40 SAND; & 70,115# 30/50 SAND. NO HCL USED
Tubing Size:2.375 in.Tubing Setting Depth:8432 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/9/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 3350
MCF_GAS 1477
TUBING_PRESS 2300
Perforation Data:
Interval Top:6936 ft.# Of Holes:330
Interval Bottom:10483 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)60
Total Gas Produced (MCF)10658
GOR177633
GOR DeterminationMCFE
Average BOE per Day5.138
Average MCFE per Day29.804

 Federal Financial Assurance  i 

 Tribal Well  i No