Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11713
Well Classification: GW Status: PR - 3/27/2008
Well Name/No:N. PARACHUTE #EF02D-24 E19 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/27/2008
FacilityID:282302LocationID:335579
County:GARFIELD #045Location:SWNW 19 5S95W 6
Field:GRAND VALLEY - #31290Elevation:5994 ft.
Basin:PICEANCE BASIN  
Planned Location:1349FNL  1281 FWLLat/Long: 39.602850 / -108.104042Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.602853 / -108.104058Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/27/2008             Measured TD: 10466 ft.    Vertical TD: 9308 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/27/2008
Wellbore PermitDIRECTIONAL
Permit #:20054376 Expiration Date:12/27/2006
Proposed Top PZ Location:Sec:24 Twp: 5S 96W Footage: 1617 FNL  1032 FEL
Bottom Hole Location:Sec:24 Twp: 5S 96W Footage: 1137 FNL  1967 FEL
Proposed Depth/Form:10835 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15,510, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/20/2007
Spud Date:4/6/2006Spud Date Is:ACTUAL
Measured TD:10466 ft.Measured PB depth:10400 ft.
True Vertical TD:9308 ft.True Vertical PB depth:9242 ft.
Top PZ Location:Sec:24 Twp: 5S 96WFootage: 727 FNL  1703 FEL
Bottom Hole Location:Sec:24 Twp: 5S 96WFootage: 727 FNL  1703 FEL
Log Types:CBL, MUD
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 112 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2567 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 0 ft., Bottom: 2567 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10444 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1500, Top: 2402 ft., Bottom: 10444 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6466 ft.10288 ft.NN
ROLLINS10288 ft.10466 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 3/27/2008                 Interval Top: 6738 ft.    Interval Bottom: 10163 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:2/13/2008Choke Size:0.281 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/10/2008
Treatment Summary:STAGES 01-11 TREATED WITH A TOTAL OF: 50264 BBL SLICKWATER, 364477 LBS 20-40 SAND, 123028 LBS 30-50 SAND. AND 36 BBL 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:8240 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/27/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 1306
CASING_PRESS 2150
MCF_GAS 1306
TUBING_PRESS 1500
Perforation Data:
Interval Top:6738 ft.# Of Holes:330
Interval Bottom:10163 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)151
Total Gas Produced (MCF)27965
GOR185198
GOR DeterminationMCFE
Average BOE per Day13.626
Average MCFE per Day79.002

 Federal Financial Assurance  i 

 Tribal Well  i No