Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11696
Well Classification: GW Status: PR - 3/18/2006
Well Name/No:SOLVAY CHEMICALS #GM 541-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 46603
Facility Status:PRStatus Date3/18/2006
FacilityID:282174LocationID:334596
County:GARFIELD #045Location:NENE 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5266 ft.
Basin:PICEANCE BASIN  
Planned Location:652FNL  1038 FELLat/Long: 39.471452 / -108.088890Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.471400 / -108.088869Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/18/2006             Measured TD: 6350 ft.    Vertical TD: 6326 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/18/2006
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:12/21/2006
Proposed Top PZ Location:Sec: Twp: Footage: 423 FNL  717 FEL
Bottom Hole Location:Sec: Twp: Footage: 423 FNL  717 FEL
Proposed Depth/Form:6423 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:1/13/2006
Spud Date:1/6/2006Spud Date Is:ACTUAL
Measured TD:6350 ft.Measured PB depth:6301 ft.
True Vertical TD:6326 ft.True Vertical PB depth:
Top PZ Location:Sec:3 Twp: 7S 96WFootage: 417 FNL  714 FEL
Bottom Hole Location:Sec:3 Twp: 7S 96WFootage: 417 FNL  714 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1126 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1126 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6327 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 818, Top: 2390 ft., Bottom: 6326 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1513 ft.NN
FORT UNION1830 ft.NN
MESAVERDE3257 ft.NN
CAMEO5779 ft.NN
ROLLINS6279 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/18/2006                 Interval Top: 4448 ft.    Interval Bottom: 6245 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/8/2006Choke Size:0.281 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/6/2006
Treatment Summary:3509 GALS 7 1/2% HCL; 949000# 30/50 SAND; 22144 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5696 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/18/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 162600
CALC_MCF_GAS 1626
CASING_PRESS 1245
MCF_GAS 1626
TUBING_PRESS 1079
Perforation Data:
Interval Top:4448 ft.# Of Holes:133
Interval Bottom:6245 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7084
GOR644000
GOR DeterminationMCFE
Average BOE per Day3.377
Average MCFE per Day19.596

 Federal Financial Assurance  i 

 Tribal Well  i No