Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11670
Well Classification: GW Status: PR - 5/29/2006
Well Name/No:PUCKETT/TOSCO #PA 521-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/29/2006
FacilityID:18LocationID:335072
County:GARFIELD #045Location:NENW 35 6S95W 6
Field:PARACHUTE - #67350Elevation:5165 ft.
Basin:PICEANCE BASIN  
Planned Location:1170FNL  1810 FWLLat/Long: 39.485273 / -107.968903Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485296 / -107.968953Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/29/2006             Measured TD: 7612 ft.    Vertical TD: 7593 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/29/2006
Wellbore PermitDIRECTIONAL
Permit #:20054481 Expiration Date:12/15/2006
Proposed Top PZ Location:Sec: Twp: Footage: 836 FNL  1852 FWL
Bottom Hole Location:Sec: Twp: Footage: 836 FNL  1852 FWL
Proposed Depth/Form:7621 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:2/28/2006
Spud Date:2/14/2006Spud Date Is:ACTUAL
Measured TD:7612 ft.Measured PB depth:7605 ft.
True Vertical TD:7593 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 95WFootage: 840 FNL  1844 FWL
Bottom Hole Location:Sec:35 Twp: 6S 95WFootage: 840 FNL  1844 FWL
Log Types:CBL; HIGH RES INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1948 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1948 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7611 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 2850 ft., Bottom: 7611 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1727 ft.NN
FORT UNION2018 ft.NN
MESAVERDE4010 ft.NN
CAMEO6826 ft.NN
ROLLINS7477 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/29/2006                 Interval Top: 5315 ft.    Interval Bottom: 7420 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/9/2006Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2006
Treatment Summary:3,494 GALS 7.5% HCL; 778,400# 30/50 SAND; 18,702 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7022 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/29/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 952
CASING_PRESS 779
MCF_GAS 952
TUBING_PRESS 556
Perforation Data:
Interval Top:5315 ft.# Of Holes:139
Interval Bottom:7420 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)10695
GOR822692
GOR DeterminationMCFE
Average BOE per Day5.097
Average MCFE per Day29.570

 Federal Financial Assurance  i 

 Tribal Well  i No