Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11669
Well Classification: GW Status: PR - 5/27/2006
Well Name/No:PUCKETT/TOSCO #PA 421-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/27/2006
FacilityID:17LocationID:335072
County:GARFIELD #045Location:NENW 35 6S95W 6
Field:PARACHUTE - #67350Elevation:5165 ft.
Basin:PICEANCE BASIN  
Planned Location:1167FNL  1825 FWLLat/Long: 39.485282 / -107.968850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485304 / -107.968902Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/27/2006             Measured TD: 7703 ft.    Vertical TD: 7630 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/27/2006
Wellbore PermitDIRECTIONAL
Permit #:20054478 Expiration Date:12/15/2006
Proposed Top PZ Location:Sec: Twp: Footage: 567 FNL  2160 FWL
Bottom Hole Location:Sec: Twp: Footage: 567 FNL  2160 FWL
Proposed Depth/Form:7695 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:3/14/2006
Spud Date:3/1/2006Spud Date Is:ACTUAL
Measured TD:7703 ft.Measured PB depth:7670 ft.
True Vertical TD:7630 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 95WFootage: 560 FNL  2134 FWL
Bottom Hole Location:Sec:35 Twp: 6S 95WFootage: 560 FNL  2134 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1954 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 1954 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7702 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1030, Top: 2600 ft., Bottom: 7702 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1774 ft.NN
FORT UNION2067 ft.NN
MESAVERDE4120 ft.NN
CAMEO6946 ft.NN
ROLLINS7604 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/27/2006                 Interval Top: 5442 ft.    Interval Bottom: 7516 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/9/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2006
Treatment Summary:3,546 GALS 7 1/2% HCL; 844,200# 30/50 SAND; 20,102 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7149 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/27/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1013
CASING_PRESS 1387
MCF_GAS 1013
TUBING_PRESS 1222
Perforation Data:
Interval Top:5442 ft.# Of Holes:136
Interval Bottom:7516 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7363
GOR669363
GOR DeterminationMCFE
Average BOE per Day3.507
Average MCFE per Day20.355

 Federal Financial Assurance  i 

 Tribal Well  i No