Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11667
Well Classification: GW Status: PR - 6/1/2006
Well Name/No:PUCKETT #PA 322-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2006
FacilityID:13LocationID:335098
County:GARFIELD #045Location:SENW 35 6S95W 6
Field:PARACHUTE - #67350Elevation:5146 ft.
Basin:PICEANCE BASIN  
Planned Location:2099FNL  1649 FWLLat/Long: 39.482719 / -107.969473Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.482743 / -107.969457Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2006             Measured TD: 7636 ft.    Vertical TD: 7524 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2006
Wellbore PermitDIRECTIONAL
Permit #:20054546 Expiration Date:12/15/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1774 FNL  2605 FWL
Bottom Hole Location:Sec: Twp: Footage: 1774 FNL  2605 FWL
Proposed Depth/Form:7657 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/4/2006
Spud Date:3/20/2006Spud Date Is:ACTUAL
Measured TD:7636 ft.Measured PB depth:7615 ft.
True Vertical TD:7524 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 95WFootage: 1758 FNL  2589 FWL
Bottom Hole Location:Sec:35 Twp: 6S 95WFootage: 1758 FNL  2589 FWL
Log Types:CBL;RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1873 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 503, Top: 0 ft., Bottom: 1873 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7624 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 897, Top: 3310 ft., Bottom: 7623 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1630 ft.NN
FORT UNION1937 ft.NN
MESAVERDE3998 ft.NN
CAMEO6818 ft.NN
ROLLINS7535 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/1/2006                  Interval Top: 5560 ft.    Interval Bottom: 7441 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/26/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/25/2006
Treatment Summary:2502 GALS 7.5% HCL; 661,700# 20/40 SAND; 16,044 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7010 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1680
CASING_PRESS 1905
MCF_GAS 1680
TUBING_PRESS 1796
Perforation Data:
Interval Top:5560 ft.# Of Holes:107
Interval Bottom:7441 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)10
Total Gas Produced (MCF)6218
GOR621800
GOR DeterminationMCFE
Average BOE per Day2.965
Average MCFE per Day17.190

 Federal Financial Assurance  i 

 Tribal Well  i No