Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11659
Well Classification: GW Status: PR - 12/14/2005
Well Name/No:N.PARACHUTE #EF 15B G29 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/14/2005
FacilityID:282110LocationID:335573
County:GARFIELD #045Location:SWNE 29 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6102 ft.
Planned Location:2276FNL  1560 FELLat/Long: 39.585747 / -108.074196Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.585817 / -108.074181Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/18/2005             Measured TD: 9915 ft.    Vertical TD: 9485 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/18/2005
Wellbore PermitDIRECTIONAL
Permit #:20054635 Expiration Date:12/13/2006
Proposed Top PZ Location:Sec:29 Twp: 5S 95W Footage: 1182 FSL  2209 FEL
Bottom Hole Location:Sec:29 Twp: 5S 95W Footage: 1182 FSL  2209 FEL
Proposed Depth/Form:10908 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15,510, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/1/2007
Spud Date:3/8/2006Spud Date Is:ACTUAL
Measured TD:9915 ft.Measured PB depth:9881 ft.
True Vertical TD:9485 ft.True Vertical PB depth:9451 ft.
Top PZ Location:Sec:29 Twp: 5S 95WFootage: 1182 FSL  2209 FEL
Bottom Hole Location:Sec:29 Twp: 5S 95WFootage: 1182 FSL  2209 FEL
Log Types:
Log Types:CBL & MUD
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2520 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 2525 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 4.5 in., Top: 0 ft., Depth: 9905 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1340, Top: 2150 ft., Bottom: 9915 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6137 ft.9797 ft.NN
ROLLINS9797 ft.9915 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 11/14/2007                Interval Top: 8116 ft.    Interval Bottom: 9742 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/1/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/9/2007
Treatment Summary:STAGES 1-05 TREATED W/TOTAL 11,834 BBLS SLICKWATER, 225,000 LBS 20-40 SAND, 162,000 LBS 30-50 SAND, AND 36 BBLS 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:8080 ft.
Tubing Packer Depth:8778 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/14/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 1170
CASING_PRESS 225
MCF_GAS 628
TUBING_PRESS 400
Perforation Data:
Interval Top:8116 ft.# Of Holes:150
Interval Bottom:9742 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)73
Total Gas Produced (MCF)12998
GOR178054
GOR DeterminationMCFE
Average BOE per Day6.346
Average MCFE per Day36.822

 Federal Financial Assurance  i 

 Tribal Well  i No