Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11656
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:N PARACHUTE EF02B-32 #G29 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:282113LocationID:335573
County:GARFIELD #045Location:SWNE 29 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6100 ft.
Basin:PICEANCE BASIN  
Planned Location:2265FNL  1556 FELLat/Long: 39.585844 / -108.074167Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.585849 / -108.074177Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 10465 ft.    Vertical TD: 9412 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20065902 Expiration Date:11/28/2007
Proposed Top PZ Location:Sec:32 Twp: 5S 95W Footage: 217 FNL  2221 FEL
Bottom Hole Location:Sec:32 Twp: 5S 95W Footage: 217 FNL  2221 FEL
Proposed Depth/Form:11488 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/6/2007
Spud Date:3/7/2007Spud Date Is:ACTUAL
Measured TD:10465 ft.Measured PB depth:10407 ft.
True Vertical TD:9412 ft.True Vertical PB depth:
Top PZ Location:Sec:32 Twp: 5S 95WFootage: 217 FNL  2221 FEL
Bottom Hole Location:Sec:32 Twp: 5S 95WFootage: 217 FNL  2221 FEL
Log Types:MUD, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2522 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 0 ft., Bottom: 2535 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10452 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1490, Top: 1560 ft., Bottom: 10465 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6719 ft.10337 ft.NN
ROLLINS10337 ft.10465 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 6792 ft.    Interval Bottom: 10233 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/1/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/4/2007
Treatment Summary:STAGES 01-10 TREATED WITH A TOTAL OF 29181 BBLS OF SLICKWATER, 725078 LBS 20-40 SAND, 263611 LBS 30-50 SAND AND 36 BBLS 15% HCL.
Tubing Size:2.375 in.Tubing Setting Depth:7937 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/31/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
MCF_GAS 813
Perforation Data:
Interval Top:6792 ft.# Of Holes:300
Interval Bottom:10233 ft.Hole Size:0.43 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)49
GOR49000
GOR DeterminationMCFE
Average BOE per Day0.025
Average MCFE per Day0.153

 Federal Financial Assurance  i 

 Tribal Well  i No