Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11651
Well Classification: GW Status: PR - 11/13/2006
Well Name/No:N.PARACHUTE #EF09B G29 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/13/2006
FacilityID:282101LocationID:335573
County:GARFIELD #045Location:SWNE 29 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6101 ft.
Basin:PICEANCE BASIN  
Planned Location:2254FNL  1530 FELLat/Long: 39.585875 / -108.074075Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.585878 / -108.074086Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/13/2006             Measured TD: 9573 ft.    Vertical TD: 9485 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/13/2006
Wellbore PermitDIRECTIONAL
Permit #:20065898 Expiration Date:11/28/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2310 FSL  990 FEL
Bottom Hole Location:Sec:29 Twp: 5S 95W Footage: 2310 FSL  990 FEL
Proposed Depth/Form:10617 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/9/2007
Spud Date:5/10/2007Spud Date Is:ACTUAL
Measured TD:9573 ft.Measured PB depth:9532 ft.
True Vertical TD:9485 ft.True Vertical PB depth:
Top PZ Location:Sec:29 Twp: 5S 95WFootage: 2371 FSL  933 FEL
Bottom Hole Location:Sec:29 Twp: 5S 95WFootage: 2371 FSL  933 FEL
Log Types:MUD, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2533 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 0 ft., Bottom: 2545 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9556 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1343, Top: 2900 ft., Bottom: 9573 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5860 ft.9489 ft.NN
ROLLINS9489 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 2/1/2011                  Interval Top: 5968 ft.    Interval Bottom: 9347 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/1/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/5/2007
Treatment Summary:STAGES 01-11 TREATED WITH A TOTAL OFL 27183 BBLS OF SLICKWATER,738952 LBS 20-40 SAND, 218065 LBS 30-50 SAND AND 36 BBLS 15% HCL.
Tubing Size:2.375 in.Tubing Setting Depth:8333 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/2/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
MCF_GAS 554
Perforation Data:
Interval Top:5968 ft.# Of Holes:330
Interval Bottom:9347 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)57
Total Gas Produced (MCF)10488
GOR184000
GOR DeterminationMCFE
Average BOE per Day5.052
Average MCFE per Day29.291

 Federal Financial Assurance  i 

 Tribal Well  i No