Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11618
Well Classification: GW Status: PR - 6/12/2006
Well Name/No:COUEY #30-15B (O30NE)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/12/2006
FacilityID:282076LocationID:335358
County:GARFIELD #045Location:SWSE 30 6S92W 6
Field:MAMM CREEK - #52500Elevation:5831 ft.
Basin:PICEANCE BASIN  
Planned Location:688FSL  2100 FWLLat/Long: 39.492419 / -107.707197Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.492429 / -107.707209Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/12/2006             Measured TD: 7396 ft.    Vertical TD: 7393 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/12/2006
Wellbore Permit
Permit #:20054593 Expiration Date:12/12/2006
Proposed Depth/Form:7396 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 191-10 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 191-8 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/29/2006
Spud Date:1/31/2006Spud Date Is:ACTUAL
Measured TD:7396 ft.Measured PB depth:6908 ft.
True Vertical TD:7393 ft.True Vertical PB depth:
Log Types:PEX-AIT, CBL/TEMP
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1515 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 1515 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7395 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 4340 ft., Bottom: 7395 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G0 ft.4013 ft.NN
WILLIAMS FORK4014 ft.7102 ft.NN
ROLLINS7103 ft.7396 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 6/12/2006                 Interval Top: 4992 ft.    Interval Bottom: 6579 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:5/30/2006Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/25/2006
Treatment Summary:STAGES 1 - 6: 33,774 BBLS SLICKWATER; 821,830 LBS 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:6037 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/12/2006Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 10
CALC_BBLS_OIL 1
CALC_GOR 927000
CALC_MCF_GAS 927
CASING_PRESS 675
MCF_GAS 927
TUBING_PRESS 250
Perforation Data:
Interval Top:4992 ft.# Of Holes:128
Interval Bottom:6579 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)14861
GOR337750
GOR DeterminationMCFE
Average BOE per Day7.139
Average MCFE per Day41.382

 Federal Financial Assurance  i 

 Tribal Well  i No