Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11601
Well Classification: GW Status: PR - 9/14/2006
Well Name/No:FEDERAL #GM 543-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27743
Facility Status:PRStatus Date9/14/2006
FacilityID:281961LocationID:335148
County:GARFIELD #045Location:NESE 35 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5826 ft.
Basin:PICEANCE BASIN  
Planned Location:2641FSL  1196 FELLat/Long: 39.480399 / -108.070905Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.480542 / -108.070918Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/14/2006             Measured TD: 7330 ft.    Vertical TD: 7257 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/14/2006
Wellbore PermitDIRECTIONAL
Permit #:20065607 Expiration Date:10/26/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1985 FSL  686 FEL
Bottom Hole Location:Sec: Twp: Footage: 1985 FSL  686 FEL
Proposed Depth/Form:7324 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-12 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:3/15/2007
Spud Date:3/6/2007Spud Date Is:ACTUAL
Measured TD:7330 ft.Measured PB depth:7283 ft.
True Vertical TD:7257 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 96WFootage: 1965 FSL  683 FEL
Bottom Hole Location:Sec:35 Twp: 6S 96WFootage: 1965 FSL  683 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1114 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 1113 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7314 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 826, Top: 2390 ft., Bottom: 7313 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2236 ft.NN
FORT UNION2541 ft.NN
MESAVERDE4079 ft.NN
CAMEO6674 ft.NN
ROLLINS7169 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/8/2007                  Interval Top: 5721 ft.    Interval Bottom: 7078 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/15/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/10/2007
Treatment Summary:2538 GALS 7 1/2% HCL, 781300# 30/50 SAND, 19387 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7387 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/8/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1410
MCF_GAS 1073
TUBING_PRESS 1272
Perforation Data:
Interval Top:5721 ft.# Of Holes:101
Interval Bottom:7078 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)39
Total Gas Produced (MCF)21477
GOR550692
GOR DeterminationMCFE
Average BOE per Day10.253
Average MCFE per Day59.464

 Federal Financial Assurance  i Y

 Tribal Well  i No