Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11588
Well Classification: GW Status: PR - 2/1/2014
Well Name/No:N. PARACHUTE #EF05B D28 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2014
FacilityID:281943LocationID:335822
County:GARFIELD #045Location:NWNW 28 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6194 ft.
Basin:PICEANCE BASIN  
Planned Location:1276FNL  816 FWLLat/Long: 39.588553 / -108.065758Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.588560 / -108.065769Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2014             Measured TD: 9737 ft.    Vertical TD: 9697 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2014
Wellbore PermitDIRECTIONAL
Permit #:20071820 Expiration Date:5/10/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1650 FNL  330 FWL
Bottom Hole Location:Sec:28 Twp: 5S 95W Footage: 1650 FNL  330 FWL
Proposed Depth/Form:10389 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/14/2007
Spud Date:5/22/2007Spud Date Is:ACTUAL
Measured TD:9737 ft.Measured PB depth:9677 ft.
True Vertical TD:9697 ft.True Vertical PB depth:9637 ft.
Top PZ Location:Sec:28 Twp: 5S 96WFootage: 1588 FNL  447 FWL
Bottom Hole Location:Sec:28 Twp: 5S 96WFootage: 1588 FNL  447 FWL
Log Types:CBL AND MUD
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 154 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 54, Top: 0 ft., Bottom: 150 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2522 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 2522 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9722 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1221, Top: 2550 ft., Bottom: 9722 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5927 ft.9575 ft.NN
ROLLINS9575 ft.9737 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 2/1/2014                  Interval Top: 6034 ft.    Interval Bottom: 9528 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/26/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/14/2007
Treatment Summary:STAGES 1-22 TREATED W/25,789 BBLS SLICKWATER, 646,000 # 20/40 SAND, 286,000 # 30/50 SAND & 36 BBLS 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:7162 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/2/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 1170
CASING_PRESS 930
MCF_GAS 1282
TUBING_PRESS 400
Perforation Data:
Interval Top:6034 ft.# Of Holes:330
Interval Bottom:9528 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)55
Total Gas Produced (MCF)9900
GOR180000
GOR DeterminationMCFE
Average BOE per Day4.833
Average MCFE per Day28.005

 Federal Financial Assurance  i 

 Tribal Well  i No