Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11576
Well Classification: GW Status: PR - 4/3/2007
Well Name/No:N.PARACHUTE #EF 16B C27A 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/3/2007
FacilityID:281924LocationID:335824
County:GARFIELD #045Location:NENW 27 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6408 ft.
Basin:PICEANCE BASIN  
Planned Location:1205FNL  2086 FWLLat/Long: 39.588680 / -108.042560Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.588692 / -108.042587Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/3/2007             Measured TD: 11021 ft.    Vertical TD: 10137 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/3/2007
Wellbore PermitDIRECTIONAL
Permit #:20071712 Expiration Date:5/10/2008
Proposed Top PZ Location:Sec: Twp: Footage: 990 FSL  990 FEL
Bottom Hole Location:Sec:22 Twp: 5S 95W Footage: 990 FSL  990 FEL
Proposed Depth/Form:11378 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/30/2007
Spud Date:6/22/2007Spud Date Is:ACTUAL
Measured TD:11021 ft.Measured PB depth:10945 ft.
True Vertical TD:10137 ft.True Vertical PB depth:10061 ft.
Top PZ Location:Sec:22 Twp: 5S 95WFootage: 906 FSL  786 FEL
Bottom Hole Location:Sec:22 Twp: 5S 95WFootage: 906 FSL  786 FEL
Log Types:MUD AND CBL
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2505 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 2525 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10990 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1630, Top: 3300 ft., Bottom: 10990 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK7078 ft.10895 ft.NN
ROLLINS10895 ft.11021 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 2/1/2011                  Interval Top: 7158 ft.    Interval Bottom: 10696 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:12/15/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/19/2007
Treatment Summary:STAGES 1-10 TREATED W/TOTAL 39,649 BBLS SLICKWATER, 659,400 LBS 20-40 SAND, 203,700 LBS 30-50 SAND, AND 14 BBLS 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:8996 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/22/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 719
MCF_GAS 852
TUBING_PRESS 256
Perforation Data:
Interval Top:7158 ft.# Of Holes:300
Interval Bottom:10696 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)76
Total Gas Produced (MCF)13609
GOR179065
GOR DeterminationMCFE
Average BOE per Day6.636
Average MCFE per Day38.496

 Federal Financial Assurance  i 

 Tribal Well  i No