Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11539
Well Classification: GW Status: PR - 8/1/2024
Well Name/No:N. PARACHUTE CP 11A-04 K04 #596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:281800LocationID:335690
County:GARFIELD #045Location:NESW 4 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8203 ft.
Basin:PICEANCE BASIN  
Planned Location:2176FSL  2442 FWLLat/Long: 39.642786 / -108.174869Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.642787 / -108.174871Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2024             Measured TD: 10800 ft.    Vertical TD: 10795 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20066043 Expiration Date:12/4/2007
Proposed Depth/Form:10745 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15,510, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/7/2007
Spud Date:12/24/2006Spud Date Is:ACTUAL
Measured TD:10800 ft.Measured PB depth:
True Vertical TD:10795 ft.True Vertical PB depth:
Top PZ Location:Sec:4 Twp: 5S 96WFootage: 2176 FSL  2445 FWL
Bottom Hole Location:Sec:4 Twp: 5S 96WFootage: 2176 FSL  2445 FWL
Log Types:CBL, VDL, GR-CCLTEMP, MULTIPOLE ACOUSTILOG, COMPENSATED NEUTRON, GR, CALIPER
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 6, Top: , Bottom: 120 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3528 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2798, Top: , Bottom: 3528 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 10741 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 6480 ft., Bottom: 10740 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH3179 ft.NN
WASATCH G5319 ft.NN
OHIO CREEK6567 ft.NN
WILLIAMS FORK6975 ft.NN
CAMEO10058 ft.NN
ROLLINS10618 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/1/2024                  Interval Top: 7640 ft.    Interval Bottom: 10536 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/10/2007Choke Size:0.500 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/25/2007
Treatment Summary:STAGE 1-9 36,505 BBLS SLICKWATER/ STAGE 1-9 183,000 LBS 100 MESH , 1,185,862 LBS 30/50 MESH
Tubing Size:2.375 in.Tubing Setting Depth:8760 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/22/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1850
BBLS_OIL 0
CALC_BBLS_H2O 1850
CALC_BBLS_OIL 0
CALC_MCF_GAS 322
CASING_PRESS 645
MCF_GAS 322
TUBING_PRESS 0
Perforation Data:
Interval Top:7640 ft.# Of Holes:245
Interval Bottom:10536 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)60
Total Gas Produced (MCF)9804
GOR163400
GOR DeterminationMCFE
Average BOE per Day4.827
Average MCFE per Day28.006

 Federal Financial Assurance  i 

 Tribal Well  i No