Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11536
Well Classification: GW Status: PR - 2/8/2007
Well Name/No:MEAD #30-14A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/8/2007
FacilityID:281765LocationID:335196
County:GARFIELD #045Location:SWSW 30 6S93W 6
Field:RULISON - #75400Elevation:6216 ft.
Basin:PICEANCE BASIN  
Planned Location:886FSL  1147 FWLLat/Long: 39.492070 / -107.822738Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.492000 / -107.822782Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/8/2007             Measured TD: 8838 ft.    Vertical TD: 8798 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/8/2007
Wellbore PermitDIRECTIONAL
Permit #:20054128 Expiration Date:12/1/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1348 FSL  1320 FWL
Bottom Hole Location:Sec: Twp: Footage: 1348 FSL  1320 FWL
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: 139-47 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-47 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:7/26/2006
Spud Date:6/2/2006Spud Date Is:ACTUAL
Measured TD:8838 ft.Measured PB depth:8826 ft.
True Vertical TD:8798 ft.True Vertical PB depth:8786 ft.
Top PZ Location:Sec:30 Twp: 6S 93WFootage: 1205 FSL  1145 FWL
Bottom Hole Location:Sec:30 Twp: 6S 93WFootage: 1205 FSL  1145 FWL
Log Types:CEMENT BOND/GAMMA RAY/CCL, TRIPLE COMBO, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 50 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1225 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 0 ft., Bottom: 1225 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8826 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 638, Top: 4500 ft., Bottom: 8826 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK7829 ft.NN
CAMEO7829 ft.8732 ft.NN

Formation WFCMC                   Formation Classification:  GW                   Status:  PR - 2/8/2007                  Interval Top: 6660 ft.    Interval Bottom: 8680 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO COAL
1st Production Date:9/17/2006Choke Size:0.281 in.
Formation Name:WILLIAMS FORK-CAMEO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/13/2006
Treatment Summary:SEE ATTACHMENT
Tubing Size:2.375 in.Tubing Setting Depth:8006 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/10/2006Test Method:ACTUAL FLOW
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 32
BBLS_OIL 12
BTU_GAS 1
CASING_PRESS 725
MCF_GAS 725
TUBING_PRESS 475
Perforation Data:
Interval Top:6660 ft.# Of Holes:351
Interval Bottom:8680 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)60
Total Gas Produced (MCF)20783
GOR346383
GOR DeterminationMCFE
Average BOE per Day9.983
Average MCFE per Day57.912

 Federal Financial Assurance  i 

 Tribal Well  i No