Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11530
Well Classification: GW Status: PR - 2/8/2007
Well Name/No:MEAD #30-12C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/8/2007
FacilityID:281756LocationID:335196
County:GARFIELD #045Location:SWSW 30 6S93W 6
Field:RULISON - #75400Elevation:6216 ft.
Basin:PICEANCE BASIN  
Planned Location:876FSL  1128 FWLLat/Long: 39.492040 / -107.822798Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.491970 / -107.822850Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/11/2006             Measured TD: 9061 ft.    Vertical TD: 8903 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/11/2006
Wellbore PermitDIRECTIONAL
Permit #:20054122 Expiration Date:12/1/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1906 FSL  225 FWL
Bottom Hole Location:Sec: Twp: Footage: 1906 FSL  225 FWL
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: 139-47 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-47 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:2/8/2006
Spud Date:1/22/2006Spud Date Is:ACTUAL
Measured TD:9061 ft.Measured PB depth:9038 ft.
True Vertical TD:8903 ft.True Vertical PB depth:8880 ft.
Top PZ Location:Sec:30 Twp: 6S 93WFootage: 1732 FSL  251 FWL
Bottom Hole Location:Sec:30 Twp: 6S 93WFootage: 1732 FSL  251 FWL
Log Types:CBL/TEMP, PLATFORM EXPRESS TRIPLE COMBO PRESENTATION
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1523 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 0 ft., Bottom: 1523 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9038 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1703, Top: 3414 ft., Bottom: 9038 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5082 ft.8031 ft.NN
CAMEO8031 ft.8841 ft.NN

Formation WFCMC                   Formation Classification:  GW                   Status:  PR - 2/8/2007                  Interval Top: 6889 ft.    Interval Bottom: 8814 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO COAL
1st Production Date:9/17/2006Choke Size:0.281 in.
Formation Name:WILLIAMS FORK-CAMEO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/13/2006
Treatment Summary:MEAD 30-42 SWSW SEC. 30-T6S-R93W API-05-045-11530 STAGE 1 PERFS: 8812-14, 8766-68, 8748-51, 8686-89; 3 SPF, 0.34", 30 SHOTS TOTAL FRACTURED THE CAMEO COALS-AS MEASURED TOTALS: SLICKWATER PAD 4990 GALS, SLICKWATER (PROPPANT LADEN) 59,754 GALS, 20# LINEAR GEL FLUSH 13,393 GALS, 40/70/ JORDAN SAND 5,000 LBS, 20/40 JORDAN SAND 62,566 LBS-MTP @ 5615 PSI - ATP @ 4904 PSI- MAX RATE @ 34 BPM-ISIP 4120 STAGE II PERFS: 8590-94, 8549-52, 8521-24, 8464-67, 8346-49; 3 SPF, 0.34", 48 SHOTS TOTAL FRACTURED THE CAMEO COALS-AS MEASURED TOTALS: SLICKWATER PAD 4943 GALS, SLICKWATER (PROPPANT LADEN) 106,389 GALS, 20# LINEAR GEL FLUSH 23,766 GALS, 10# LINEAR GEL FLUSH 5548 GALS, 40/70/ JORDAN SAND 5000 LBS, 20/40 JORDAN SAND 124,072 LBS-MTP @ 6189 PSI-ATP @ 5615 PSI-MAX RATE @ 49 BPM - ISIP 3879 STAGE III PERFS: 8213-16, 8197-99, 8178-80, 8148-50, 8088-92; 3 SPF, 0.34", 39 SHOTS TOTAL FRACTURED THE CAMEO COALS-AS MEASURED TOTALS: SLICKWATER PAD 4939 GALS, SLICKWATER ( PROPPANT LADEN) 126,398 GALS, 20# LINEAR FLUSH 38,939 GALS, 10# LINEAR GEL FLUSH 5292 GALS, 40/70 JORDAN SAND 5000 LBS, 20/40 JORDAN SAND 165,274 LBS-MTP @ 5403 PSI-ATP @ 4879 PSI-MAX RATE @ 54 BPM-ISIP 3666. STAGE IV PERFS: 7970-72, 7910-12, 7862-65, 7824-27; 3 SPF, 0.34", 30 SHOTS TOTAL FRACTURED THE CAMEO COALS-AS MEASURED TOTALS: SLICKWATER PAD 4914 GALS, SLICKWATER (PROPPANT LADEN) 76,967 GALS, 20# LINEAR GEL 20,938 GALS, 10# LINEAR GEL FLUSH 5095 GALS, 40/70 JORDAN SAND 5000 LBS, 20/40 JORDAN SAND 92,319 LBS-MTP @ 5403 PSI - ATP @ 4829 PSI- MAX RATE @ 50 BPM- ISIP 3325 STAGE V PERFS: 7752-54, 7740-42, 7652-56, 7554-55, 7534-35; SPF, 0.34", 30 SHOTS TOTAL FRACTURED THE CAMEO COALS - AS MEASURED TOTALS: SLICKWATER PAD 4969 GALS, SLICKWATER (PROPPANT LADEN) 79,728 GALS, 20# LINEAR GEL 21,570 GALS, 10# LINEAR GEL FLUSH 4918 GALS, 40/70 JORDAN SAND 5000 LBS, 20/40 JORDAN SAND 97,402 LBS - MTP @ 5590 PSI - ATP @ 5116 PSI - MAX RATE @ 52 BPM -ISIP 2960 STAGE VI PERFS: 7472-75, 7433-36, 7360-62, 7376-79, 7321-22; 3 SPF, 0.34", 36 SHOTS TOTAL FRACTURED THE CAMEO COALS - AS MEASURED TOTALS: SLICKWATER PAD 4922 GALS, SLICKWATER (PROPPANT LADEN) 95,379 GALS, 20# LINEAR GEL 27,075 GALS, 10# LINEAR GEL FLUSH 4784 GALS, 40/70 JORDAN SAND 5000 LBS, 20/40 JORDAN SAND 120,446 LBS-MTP @ 5528 PSI - ATP @ 4792 PSI - MAX RATE @ 56 BPM - ISIP 2744. STAGE VII PERFS: 7240-42, 7218-20, 7182-85; 3 SPF, 0.34", 21 SHOTS TOTAL FRACTURED THE CAMEO COALS-AS MEASURED TOTALS: SLICKWATER PAD 5015 GALS, SLICKWATER (PROPPANT LADEN) 81,261 GALS, 20# LINEAR GEL 26,266, 10# LINEAR GEL FLUSH 4666 GALS, 40/70 JORDAN SAND 5000 LBS, 20/40 JORDAN SAND 116,054 LBS-MTP @ 5690 PSI - ATP @ 4879 PSI-MAX RATE @ 62 BPM-ISIP 2505
Tubing Size:2.375 in.Tubing Setting Depth:8171 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/10/2006Test Method:ACTUAL FLOW
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 8
BTU_GAS 1
CASING_PRESS 1150
MCF_GAS 1297
TUBING_PRESS 800
Perforation Data:
Interval Top:6889 ft.# Of Holes:264
Interval Bottom:8814 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)43
Total Gas Produced (MCF)14563
GOR338674
GOR DeterminationMCFE
Average BOE per Day6.998
Average MCFE per Day40.595

 Federal Financial Assurance  i 

 Tribal Well  i No