Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11524
Well Classification: GW Status: PR - 12/2/2005
Well Name/No:LANGSTAFF #RWF 413-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CR 49
Facility Status:PRStatus Date12/2/2005
FacilityID:281748LocationID:335188
County:GARFIELD #045Location:NESW 16 6S94W 6
Field:RULISON - #75400Elevation:5577 ft.
Basin:PICEANCE BASIN  
Planned Location:1725FSL  1584 FWLLat/Long: 39.522758 / -107.897223Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.522869 / -107.897327Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/24/2005             Measured TD: 8126 ft.    Vertical TD: 8037 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/24/2005
Wellbore PermitDIRECTIONAL
Permit #:20054109 Expiration Date:12/1/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1603 FSL  684 FWL
Bottom Hole Location:Sec: Twp: Footage: 1603 FSL  684 FWL
Proposed Depth/Form:8096 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 495-3 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:3/14/2006
Spud Date:2/24/2006Spud Date Is:ACTUAL
Measured TD:8126 ft.Measured PB depth:8057 ft.
True Vertical TD:8037 ft.True Vertical PB depth:
Top PZ Location:Sec:16 Twp: 6S 94WFootage: 1604 FSL  690 FWL
Bottom Hole Location:Sec:16 Twp: 6S 94WFootage: 1604 FSL  690 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1130 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1130 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8094 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 993, Top: 4600 ft., Bottom: 8094 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1966 ft.NN
MESAVERDE4535 ft.NN
CAMEO7329 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/6/2006                  Interval Top: 6008 ft.    Interval Bottom: 7932 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/26/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/25/2006
Treatment Summary:3573 GALS 7 1/2% HCL; 618,900# 20/40 SAND; 15,577 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7382 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/6/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1616
MCF_GAS 1266
TUBING_PRESS 1525
Perforation Data:
Interval Top:6008 ft.# Of Holes:127
Interval Bottom:7932 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)12947
GOR404593
GOR DeterminationMCFE
Average BOE per Day6.211
Average MCFE per Day35.992

 Federal Financial Assurance  i 

 Tribal Well  i No