Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11508
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:JONSSON #19-02D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:281732LocationID:335195
County:GARFIELD #045Location:SENE 19 6S93W 6
Field:RULISON - #75400Elevation:5640 ft.
Basin:PICEANCE BASIN  
Planned Location:1722FNL  1033 FELLat/Long: 39.513760 / -107.811988Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.513950 / -107.812160Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 8794 ft.    Vertical TD: 8721 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20054056 Expiration Date:11/30/2006
Proposed Top PZ Location:Sec:19 Twp: 6S 93W Footage: 1244 FSL  1419 FWL
Bottom Hole Location:Sec:19 Twp: 6S 93W Footage: 1244 FSL  1419 FWL
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: 139-47 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-47 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:3/28/2006
Spud Date:3/9/2006Spud Date Is:ACTUAL
Measured TD:8794 ft.Measured PB depth:8793 ft.
True Vertical TD:8721 ft.True Vertical PB depth:8720 ft.
Top PZ Location:Sec:19 Twp: 6S 93WFootage: 1244 FSL  1419 FWL
Bottom Hole Location:Sec:19 Twp: 6S 93WFootage: 1244 FSL  1419 FWL
Log Types:ACOUSTIC CBL, TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1542 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 0 ft., Bottom: 1542 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8793 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1683, Top: 930 ft., Bottom: 8793 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK4875 ft.7838 ft.NN
CAMEO7838 ft.8667 ft.NN

Formation WFCMC                   Formation Classification:  GW                   Status:  PR - 7/1/2024                  Interval Top: 6612 ft.    Interval Bottom: 8624 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO COAL
1st Production Date:9/5/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK-CAMEO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/15/2006
Treatment Summary:SEE ATTACHMENT
Tubing Size:2.375 in.Tubing Setting Depth:7907 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/20/2006Test Method:ACTUAL FLOW
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 2
BTU_GAS 1106
CASING_PRESS 590
MCF_GAS 334
TUBING_PRESS 275
Perforation Data:
Interval Top:6612 ft.# Of Holes:315
Interval Bottom:8624 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)30
Total Gas Produced (MCF)12169
GOR405633
GOR DeterminationMCFE
Average BOE per Day5.826
Average MCFE per Day33.810

 Federal Financial Assurance  i 

 Tribal Well  i No