Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11505
Well Classification: GW Status: PR - 3/30/2006
Well Name/No:SOLVAY CHEMICALS INC #GM 411-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/30/2006
FacilityID:281728LocationID:334771
County:GARFIELD #045Location:NWNW 2 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5271 ft.
Basin:PICEANCE BASIN  
Planned Location:458FNL  629 FWLLat/Long: 39.471989 / -108.083136Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.472080 / -108.082970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/30/2006             Measured TD: 6408 ft.    Vertical TD: 6387 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/30/2006
Wellbore PermitDIRECTIONAL
Permit #:20054035 Expiration Date:11/30/2006
Proposed Top PZ Location:Sec: Twp: Footage: 125 FNL  764 FWL
Bottom Hole Location:Sec: Twp: Footage: 125 FNL  764 FWL
Proposed Depth/Form:6491 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:2/11/2006
Spud Date:2/4/2006Spud Date Is:ACTUAL
Measured TD:6408 ft.Measured PB depth:6328 ft.
True Vertical TD:6387 ft.True Vertical PB depth:
Top PZ Location:Sec:2 Twp: 7S 96WFootage: 113 FNL  780 FWL
Bottom Hole Location:Sec:2 Twp: 7S 96WFootage: 113 FNL  780 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1127 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1127 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6374 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 1850 ft., Bottom: 6373 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1553 ft.NN
FORT UNION1871 ft.NN
MESAVERDE3317 ft.NN
CAMEO5885 ft.NN
ROLLINS6364 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/30/2006                 Interval Top: 4590 ft.    Interval Bottom: 6307 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/26/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/24/2006
Treatment Summary:3049 GALS 7 1/2% HCL; 678800# 30/50 SAND, 16112 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5200 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 113200
CALC_MCF_GAS 1132
CASING_PRESS 1069
TUBING_PRESS 935
Perforation Data:
Interval Top:4590 ft.# Of Holes:100
Interval Bottom:6307 ft.Hole Size:0.35 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1682
GOR
GOR DeterminationMCFE
Average BOE per Day0.795
Average MCFE per Day4.608

 Federal Financial Assurance  i 

 Tribal Well  i No