Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11459
Well Classification: GW Status: PR - 11/17/2005
Well Name/No:N.PARACHUTE #EF06D C28 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/17/2005
FacilityID:281417LocationID:335657
County:GARFIELD #045Location:NENW 28 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6168 ft.
Basin:PICEANCE BASIN  
Planned Location:1228FNL  2214 FWLLat/Long: 39.588667 / -108.060826Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.588672 / -108.060800Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/11/2005             Measured TD: 9794 ft.    Vertical TD: 9696 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/11/2005
Wellbore PermitDIRECTIONAL
Permit #:20053849 Expiration Date:11/16/2006
Proposed Top PZ Location:Sec:28 Twp: 5S 95W Footage: 2310 FNL  2310 FWL
Bottom Hole Location:Sec:28 Twp: 5S 95W Footage: 2310 FNL  2310 FWL
Proposed Depth/Form:10603 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/14/2006
Spud Date:7/8/2006Spud Date Is:ACTUAL
Measured TD:9794 ft.Measured PB depth:9725 ft.
True Vertical TD:9696 ft.True Vertical PB depth:9627 ft.
Top PZ Location:Sec:28 Twp: 5S 95WFootage: 2239 FNL  2362 FWL
Bottom Hole Location:Sec:28 Twp: 5S 95WFootage: 2239 FNL  2362 FWL
Log Types:
Log Types:CBL & MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 95 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 95 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2539 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 2540 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9771 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1217, Top: 2340 ft., Bottom: 9777 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5959 ft.9649 ft.NN
ROLLINS9649 ft.9794 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 1/1/2011                  Interval Top: 6140 ft.    Interval Bottom: 9569 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:7/11/2007Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/1/2007
Treatment Summary:STAGES 1-10 TREATED W/TOTAL OF: 33,411 BBLS SLICKWATER, 946,000 LBS 20-40 SAND , 324,000 LBS 30-50 SAND, AND 36 BBLS OF 15% HCI.
Tubing Size:2.375 in.Tubing Setting Depth:7158 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/7/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 1170
CASING_PRESS 2750
MCF_GAS 892
TUBING_PRESS 1850
Perforation Data:
Interval Top:6140 ft.# Of Holes:300
Interval Bottom:9569 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)59
Total Gas Produced (MCF)10840
GOR183728
GOR DeterminationMCFE
Average BOE per Day5.281
Average MCFE per Day30.624

 Federal Financial Assurance  i 

 Tribal Well  i No