Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11449
Well Classification: GW Status: PR - 5/1/2015
Well Name/No:SHIDELER FEDERAL #6-3 (031E)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C 51156
Facility Status:PRStatus Date5/1/2015
FacilityID:281407LocationID:334156
County:GARFIELD #045Location:SWSE 31 7S92W 6
Field:MAMM CREEK - #52500Elevation:7107 ft.
Basin:PICEANCE BASIN  
Planned Location:209FSL  2102 FELLat/Long: 39.396302 / -107.706603Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.396389 / -107.706410Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2015             Measured TD: 8764 ft.    Vertical TD: 8541 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2015
Wellbore PermitDIRECTIONAL
Permit #:20053852 Expiration Date:11/16/2006
Proposed Top PZ Location:Sec:6 Twp: 8S 92W Footage: 275 FNL  800 FWL
Bottom Hole Location:Sec:6 Twp: 8S 92W Footage: 275 FNL  800 FWL
Proposed Depth/Form:8920 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit:HUNTER MESA UNI Unit Number:COC 55972X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/2/2006
Spud Date:12/18/2005Spud Date Is:ACTUAL
Measured TD:8764 ft.Measured PB depth:8702 ft.
True Vertical TD:8541 ft.True Vertical PB depth:
Top PZ Location:Sec:6 Twp: 8S 92WFootage: 665 FNL  731 FWL
Bottom Hole Location:Sec:6 Twp: 8S 92WFootage: 665 FNL  731 FWL
Log Types:RST, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 90, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1524 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1075, Top: 0 ft., Bottom: 1524 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8764 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1355, Top: 4032 ft., Bottom: 8764 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.5719 ft.NN
WILLIAMS FORK5720 ft.8671 ft.NN
ROLLINS8672 ft.8764 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/1/2015                  Interval Top: 6976 ft.    Interval Bottom: 8307 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/20/2006Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/7/2013Treatment End Date:5/7/2013
Treatment Summary:CIBP @ 6880' WAS DRILLED OUT ON 5-7-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:10/5/2012Treatment End Date:10/5/2012
Treatment Summary:CIBP SET AT 6880' WITH 2 SX CEMENT. PRESSURE TESTED TO 1500 PSI FOR 15 MIN, NO PRESSURE LOSS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/13/2006
Treatment Summary:STAGES 1 THROUGH 4 WERE TREATED W/A TOTAL OF 35,101 BBLS OF SLICKWATER & 797,252# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 588
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 588
CALC_BBLS_OIL 1
CALC_GOR 205600
CALC_MCF_GAS 2056
CASING_PRESS 2025
GRAVITY_OIL 2
MCF_GAS 2056
TUBING_PRESS 1150
Perforation Data:
Interval Top:6976 ft.# Of Holes:88
Interval Bottom:8307 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)14227
GOR677476
GOR DeterminationMCFE
Average BOE per Day6.779
Average MCFE per Day39.323

 Federal Financial Assurance  i Y

 Tribal Well  i No