Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11427
Well Classification: GW Status: PR - 3/30/2006
Well Name/No:AMERICAN SODA #GM 514-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/30/2006
FacilityID:281276LocationID:334773
County:GARFIELD #045Location:SWSW 35 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5350 ft.
Basin:PICEANCE BASIN  
Planned Location:822FSL  483 FWLLat/Long: 39.475499 / -108.083506Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.475590 / -108.083480Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/30/2006             Measured TD: 6563 ft.    Vertical TD: 6475 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/30/2006
Wellbore PermitDIRECTIONAL
Permit #:20053767 Expiration Date:11/13/2006
Proposed Top PZ Location:Sec: Twp: Footage: 505 FSL  696 FWL
Bottom Hole Location:Sec: Twp: Footage: 505 FSL  696 FWL
Proposed Depth/Form:6616 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:1/22/2006
Spud Date:1/14/2006Spud Date Is:ACTUAL
Measured TD:6563 ft.Measured PB depth:6479 ft.
True Vertical TD:6475 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 96WFootage: 518 FSL  703 FWL
Bottom Hole Location:Sec:35 Twp: 6S 96WFootage: 518 FSL  703 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1120 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6502 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 1750 ft., Bottom: 6502 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1646 ft.NN
FORT UNION1972 ft.NN
MESAVERDE3413 ft.NN
CAMEO5986 ft.NN
ROLLINS6469 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/30/2006                 Interval Top: 4675 ft.    Interval Bottom: 6428 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/7/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/4/2006
Treatment Summary:4,075 GALS 7.5% HCL; 751,500# 30/40 SAND; 17,554 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5874 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1356
CASING_PRESS 1160
TUBING_PRESS 1029
Perforation Data:
Interval Top:4675 ft.# Of Holes:106
Interval Bottom:6428 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)16357
GOR778904
GOR DeterminationMCFE
Average BOE per Day7.789
Average MCFE per Day45.161

 Federal Financial Assurance  i 

 Tribal Well  i No