Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11379
Well Classification: GW Status: PR - 12/1/2010
Well Name/No:CHEVRON #NG 344-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2010
FacilityID:280842LocationID:335634
County:GARFIELD #045Location:SESE 8 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5620 ft.
Basin:PICEANCE BASIN  
Planned Location:807FSL  823 FELLat/Long: 39.533877 / -108.124107Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.533878 / -108.124061Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2010             Measured TD: 7439 ft.    Vertical TD: 7404 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2010
Wellbore PermitDIRECTIONAL
Permit #:20053488 Expiration Date:10/23/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1355 FSL  620 FEL
Bottom Hole Location:Sec: Twp: Footage: 1355 FSL  620 FEL
Proposed Depth/Form:7447 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:1/28/2006
Spud Date:1/8/2006Spud Date Is:ACTUAL
Measured TD:7439 ft.Measured PB depth:7298 ft.
True Vertical TD:7404 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 6S 96WFootage: 1368 FSL  619 FEL
Bottom Hole Location:Sec:8 Twp: 6S 96WFootage: 1368 FSL  619 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1135 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1135 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7427 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 4250 ft., Bottom: 7427 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2301 ft.NN
FORT UNION2547 ft.NN
MESAVERDE4065 ft.NN
CAMEO6778 ft.NN
ROLLINS7268 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2010                 Interval Top: 5518 ft.    Interval Bottom: 7097 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/28/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/24/2006
Treatment Summary:511 GALS 10% ACETIC ACID; 2533 GALS 7 1/2% HCL; 708200# 30/50 SAND; 16378 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6720 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/20/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1129
CASING_PRESS 1071
MCF_GAS 1129
TUBING_PRESS 915
Perforation Data:
Interval Top:5518 ft.# Of Holes:95
Interval Bottom:7097 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)12025
GOR522826
GOR DeterminationMCFE
Average BOE per Day5.744
Average MCFE per Day33.331

 Federal Financial Assurance  i 

 Tribal Well  i No