Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11365
Well Classification: GW Status: PR - 6/27/2006
Well Name/No:WILLIAMS #GM 412-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 50759
Facility Status:PRStatus Date6/27/2006
FacilityID:280815LocationID:335111
County:GARFIELD #045Location:NWSW 34 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5394 ft.
Basin:PICEANCE BASIN  
Planned Location:2333FSL  1125 FWLLat/Long: 39.479588 / -108.099986Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.479867 / -108.100018Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/27/2006             Measured TD: 6693 ft.    Vertical TD: 6617 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/27/2006
Wellbore PermitDIRECTIONAL
Permit #:20053400 Expiration Date:10/20/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2165 FNL  1078 FWL
Bottom Hole Location:Sec: Twp: Footage: 2165 FNL  1078 FWL
Proposed Depth/Form:6688 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:4/6/2006
Spud Date:3/28/2006Spud Date Is:ACTUAL
Measured TD:6693 ft.Measured PB depth:6620 ft.
True Vertical TD:6617 ft.True Vertical PB depth:
Top PZ Location:Sec:34 Twp: 6S 96WFootage: 2145 FNL  1081 FWL
Bottom Hole Location:Sec:34 Twp: 6S 96WFootage: 2145 FNL  1081 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1134 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1134 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6660 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 2230 ft., Bottom: 6660 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1734 ft.NN
FORT UNION2053 ft.NN
MESAVERDE3428 ft.NN
CAMEO6064 ft.NN
ROLLINS6524 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/27/2006                 Interval Top: 4819 ft.    Interval Bottom: 6450 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/21/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/16/2006
Treatment Summary:3515 GALS 7 1/2% HCL; 881400# 30/50 SAND;20378 BBLS SLIKCWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5889 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1298
CASING_PRESS 1408
TUBING_PRESS 1330
Perforation Data:
Interval Top:4819 ft.# Of Holes:123
Interval Bottom:6450 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)13758
GOR809294
GOR DeterminationMCFE
Average BOE per Day6.540
Average MCFE per Day37.942

 Federal Financial Assurance  i 

 Tribal Well  i No