Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11362
Well Classification: GW Status: PR - 6/20/2006
Well Name/No:WILLIAMS #GM 413-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/20/2006
FacilityID:280812LocationID:335111
County:GARFIELD #045Location:NWSW 34 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5394 ft.
Basin:PICEANCE BASIN  
Planned Location:2363FSL  1126 FWLLat/Long: 39.479668 / -108.099986Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.479785 / -108.100019Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/20/2006             Measured TD: 6584 ft.    Vertical TD: 6576 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/20/2006
Wellbore PermitDIRECTIONAL
Permit #:20053397 Expiration Date:10/20/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2555 FSL  1157 FWL
Bottom Hole Location:Sec: Twp: Footage: 2555 FSL  1157 FWL
Proposed Depth/Form:6577 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 160, Drill Unit: SW4

Wellbore Completed
Completion Date:4/25/2006
Spud Date:4/18/2006Spud Date Is:ACTUAL
Measured TD:6584 ft.Measured PB depth:6548 ft.
True Vertical TD:6576 ft.True Vertical PB depth:
Top PZ Location:Sec:34 Twp: 6S 96WFootage: 2569 FSL  1175 FWL
Bottom Hole Location:Sec:34 Twp: 6S 96WFootage: 2569 FSL  1175 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1171 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1171 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6571 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 1650 ft., Bottom: 6570 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1698 ft.NN
FORT UNION1997 ft.NN
MESAVERDE3350 ft.NN
CAMEO5946 ft.NN
ROLLINS6427 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/20/2006                 Interval Top: 4682 ft.    Interval Bottom: 6331 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/18/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/17/2006
Treatment Summary:4129 GALS 7 1/2% HCL; 1000600# 30/50 SAND; 23274 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5868 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/20/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 783
CASING_PRESS 1765
TUBING_PRESS 1641
Perforation Data:
Interval Top:4682 ft.# Of Holes:133
Interval Bottom:6331 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)16301
GOR815050
GOR DeterminationMCFE
Average BOE per Day7.750
Average MCFE per Day44.984

 Federal Financial Assurance  i 

 Tribal Well  i No