Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11353
Well Classification: GW Status: PR - 10/20/2005
Well Name/No:CHEVRON #NG 14-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/20/2005
FacilityID:280768LocationID:335619
County:GARFIELD #045Location:NWSW 8 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5791 ft.
Basin:PICEANCE BASIN  
Planned Location:1439FSL  1197 FWLLat/Long: 39.535567 / -108.136478Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.535725 / -108.136402Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/15/2005             Measured TD: 7538 ft.    Vertical TD: 7495 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/15/2005
Wellbore PermitDIRECTIONAL
Permit #:20053432 Expiration Date:10/19/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1152 FSL  665 FWL
Bottom Hole Location:Sec: Twp: Footage: 1152 FSL  665 FWL
Proposed Depth/Form:7499 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: , Drill Unit: NONE

Wellbore Completed
Completion Date:6/11/2006
Spud Date:5/29/2006Spud Date Is:ACTUAL
Measured TD:7538 ft.Measured PB depth:7475 ft.
True Vertical TD:7495 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 6S 96WFootage: 1213 FSL  683 FWL
Bottom Hole Location:Sec:8 Twp: 6S 96WFootage: 1213 FSL  683 FWL
Log Types:CBL; HIGH RESOLUTIN INDUCTION,SPECTRAL DENSITY,DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1136 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1135 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7495 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 2600 ft., Bottom: 7495 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2426 ft.NN
FORT UNION2734 ft.NN
MESAVERDE4187 ft.NN
CAMEO6888 ft.NN
ROLLINS7364 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/24/2006                 Interval Top: 5499 ft.    Interval Bottom: 7176 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/15/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/11/2006
Treatment Summary:2499 GALS 7 1/2% HCL; 578500 # 30/50 SAND; 13670 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6605 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/24/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 989
MCF_GAS 928
TUBING_PRESS 767
Perforation Data:
Interval Top:5499 ft.# Of Holes:90
Interval Bottom:7176 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)29006
GOR878969
GOR DeterminationMCFE
Average BOE per Day13.799
Average MCFE per Day80.038

 Federal Financial Assurance  i 

 Tribal Well  i No